--- title: Woodbury Zoning Ordinance, Division IV (Appendix A, Article 6). PLANNED INDUSTRIAL PARK (PIP) DISTRICT collection: local-codes id: local-code:woodbury/zoning/appendix-a-article-6-division-iv-division-iv cite_as: Woodbury, Ga., Zoning Ordinance, Appendix A, Article 6, Division IV canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/appendix-a-article-6-division-iv-division-iv md_url: https://georgiacommons.org/code/local/woodbury/zoning/appendix-a-article-6-division-iv-division-iv.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/appendix-a-article-6-division-iv-division-iv/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-a/~article-6/~division-iv.md previous: https://georgiacommons.org/code/local/woodbury/zoning/appendix-a-article-6-division-iii-division-iii.md next: https://georgiacommons.org/code/local/woodbury/zoning/article-7.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/appendix-a-article-6-division-iv-division-iv@2022-10-28-0f79e61cf6 --- # Woodbury Zoning Ordinance, Division IV (Appendix A, Article 6). PLANNED INDUSTRIAL PARK (PIP) DISTRICT > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article 6 - MASTER PLANNED DEVELOPMENTS / Division IV - PLANNED INDUSTRIAL PARK (PIP) DISTRICT Sec. Z6-33. Designing a Planned Industrial Park. A Planned Industrial Park project consists of four separate design components, as listed and defined below: A. Concept Plan—The initial design ideas and layout to elicit preliminary feedback from Planning and Zoning Commission. B. Master Plan—The overall Concept Plan for the development locking in land uses, circulation, and other elements. C. Subdivision Plat—A plat for dividing land within the industrial park. D. Site Development Plans—A set of plans for review of any individual lot development or installation of streets within the industrial park, also commonly referred to as construction plans. (Ord. of 7-15-2019) Sec. Z6-34. Planned Development Park Standards. A. Dimensional Standards. See Article 4, Lot and Building Standards of this Ordinance. B. Roads/Streets. All interior streets and roads must meet the requirements for such facilities for the City of Woodbury as well as the following: 1. The provision and/or design of streets is subject to review by the Planning and Zoning Commission which may require or allow modifications to the location, layout, or capacity of roads or attach additional requirements such as turn lanes, traffic circles, wider or narrower rights-of-way, pavement widths, medians, traffic calming or other associated features and provided that such modifications meet generally accepted traffic engineering and planning principles that can be justified by the applicant and/or verified by the Planning and Zoning Commission. 2. Public roads, road extensions, or other similar infrastructure shall be provided according to the approved Master Plan. Deviation from plans shall require approval of a revised plan. C. Utilities. All utility lines in a Planned Industrial Park shall be placed underground. D. Landscaping and Tree Preservation. Planned Industrial Parks shall present tree preservation and landscape plans as listed below: 1. Master Plans must show a Master Tree Preservation Plan prepared in accordance with the City's Tree Preservation and Landscaping Ordinance. 2. Master Plans must show a detailed Landscape Plan for all entrances into the Planned Industrial Park. 3. Site Development Plans shall comply with the approved Master Tree Preservation Plan, unless changes to the Master Tree Preservation Plan are approved by the Planning and Zoning Commission upon recommendation by the City's Landscape Architect. 4. Site Development Plans shall present a Landscape Plan in accordance with the industrial requirements of the Tree Preservation and Landscaping Ordinance. E. Grading/Erosion Control. If so desired, the developer of a Planned Industrial Park may submit a master Grading/Erosion Control Plan for approval as part of the Master Plan. The Grading/Erosion Control Plan must comply with the Master Tree Preservation Plan and other applicable City standards. The Grading/Erosion Control Plan shall be prepared in accordance with the requirements as established in Article 10, Procedures and Permits of this Ordinance. F. Hydrology. A Master Hydrology Plan is required for the entire Planned Industrial Park. All hydrology plans shall be prepared in accordance with the requirements of City of Woodbury Stormwater Detention Ordinance. (Ord. of 7-15-2019) Sec. Z6-35. Application for Requirements. Applications for a Planned Industrial Park shall apply for rezoning as outlined in Article 10, Procedures and Permits of this Ordinance and shall follow the procedures outlined in this Section. A. Concept Plan. The Concept Plan is required to display initial ideas and design for the Planned Industrial Park. The Concept Plan shall be submitted to Planning and Zoning Commission for review and comment prior to filing of the rezoning application. The Concept Plan shall show the preliminary location of roads, building pads, and tree preservation areas. Lots are not required to be shown on the Concept Plan. The Concept Plan shall be used in analyzing the application for rezoning. The Concept Plan shall contain the following information: 1. Boundary of the project property; 2. Delineation of phases (if applicable); 3. Project site acreage; 4. Preliminary street network including entrances and exits and connections to rail lines, if applicable; 5. Existing natural features of the site including rivers, lakes, ponds, streams, flood plains, water supply watersheds, and wetlands; 6. Potential location of building pads; 7. Projected tree save areas and acreage; 8. Owner's name, address, and contact information; 9. In addition, the applicant shall provide a written narrative describing the proposed project. B. Rezoning Application. After review of the Concept Plan, a rezoning application must be filed in accordance with the requirements of Article 10, Procedures and Permits. The Concept Plan shall be included as part of the rezoning application. C. Master Plan. Upon approval of the rezoning application by City Council, the developer is authorized to submit the Master Plan of the Planned Industrial Park. The Master Plan shall establish the guideline for which the development of the Planned Industrial Park shall follow. The Master Plan shall be approved by the Planning and Zoning Commission. The Master Plan shall be prepared by a Registered Landscape Architect or Civil Engineer, where required, and contain the following information: 1. Boundary of the project property; 2. Delineation of phases (if applicable); 3. Project site acreage and existing contours at 2-foot intervals; 4. Street network including entrances and exits and connections to rail lines, if applicable; 5. Natural features of the site including rivers, lakes, ponds, streams, flood plains, water supply watersheds, and wetlands; 6. Projected location of building pads; 7. Master Tree Preservation Plan; 8. Landscape Plan for entrances; 9. Master Hydrology Plan; 10. Master Grading/Erosion Control Plan, if desired; 11. Owner's name, address, and contact information; 12. Certification block as follows: Pursuant to the Planned Development provisions of the Zoning Ordinance of the City of Woodbury, Georgia, all the requirements of Master Plan approval having been fulfilled including rezoning of the property to a designation of the Planned Industrial Park this Master Plan was approved by the Planning and Zoning Commission at its meeting on (month)___________ (date)_______, (year)______. _______________ Date /s/ Secretary, Planning and Zoning Commission D. Effect of Approval. Approval of the Master Plan authorizes the developer to submit subdivision plats and Site Development Plans. Grading of the industrial park is authorized provided a Master Grading/Erosion Control Plan was approved as part of the Master Plan and after receipt of the Land Disturbing Activity Permit. E. Subdivision Plat. Any division of land with the Planned Industrial Park is subject to the requirements as established in the City of Woodbury Subdivision Ordinance. PrelimiAPPENDIX A—ZONING § Z6-35 nary Subdivision Plats must be approved by the Planning and Zoning Commission. Final Subdivision Plats must be approved by the Planning and Zoning Commission but only after streets are accepted by City Council. F. Site Development Plan. Site Development Plans, otherwise known as construction plans, shall be submitted for each individual building sites or streets as they are proposed within the park. The Site Development Plan shall be prepared in accordance with Article 10, Procedures and Permits. Site Development Plans are to be reviewed by the Zoning Administrator, approved by the Planning and Zoning Commission, and must substantially conform to the approved Master Plan. If any controversy arises as to the compliance with the Master Plan, the Plan shall be presented to the Planning and Zoning Commission for consideration. The Site Development Plan must also demonstrate compliance with the Master Tree Preservation Plan, Master Hydrology Plan, and Master Grading Plan, if applicable. G. Amendments to Approved Master Plan. The Master Plan can only be amended with approval of the Planning and Zoning Commission. (Ord. of 7-15-2019) Sec. Z6-36. Variances. Any variances requested in the Planned Industrial Park District shall be granted or denied by the Planning and Zoning Commission. In granting such variances, the Planning and Zoning Commission shall adhere to the procedures set forth in Article 11, Appeals in this Ordinance. ## History (Ord. of 7-15-2019)