--- title: Baldwin County Code of Ordinances, Sec. 17-24. Permitting requirements collection: local-codes id: local-code:baldwin-county/code/17-24 cite_as: Baldwin County, Ga., Code of Ordinances ยง 17-24 canonical_url: https://georgiacommons.org/counties/baldwin/code/17-24 md_url: https://georgiacommons.org/counties/baldwin/code/17-24.md text_url: https://georgiacommons.org/counties/baldwin/code/17-24/text source_url: https://library.municode.com/ga/baldwin_county/codes/code_of_ordinances date: 2025-04-15 status: active jurisdiction: county:baldwin jurisdiction_name: Baldwin County county_fips: "13009" corpus_version: local-codes-baldwin-county-17851875c646 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/baldwin/code/~part-ii/~chapter-17/~article-ii.md previous: https://georgiacommons.org/counties/baldwin/code/17-23.md next: https://georgiacommons.org/counties/baldwin/code/17-25.md index: https://georgiacommons.org/counties/baldwin.md branch: code edition: As published by Municode, current through 2025-04-15 edition_date_kind: current_through source_publisher: Municode version_id: local-code:baldwin-county/code/17-24@2025-04-15-b33503eace --- # Baldwin County Code of Ordinances, Sec. 17-24. Permitting requirements > As published by Municode, current through 2025-04-15 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 17 - SOLAR ENERGY DEVELOPMENT / Article II - SOLAR ENERGY DEVELOPMENT (a) All proposals for new construction of, substantial enlargement of, and/or major alteration of solar projects shall require a development permit issued by the county (a 4solar development permit4), which the county shall grant by right subject to site plan review and decommissioning plan review. (b) A solar project permit applicant shall submit a site plan to the county for review and approval. The site plan shall include a map or maps prepared at a scale of not less than one inch to 100 feet and shall include: (1) Name and address of the applicant or its authorized agent; (2) Boundaries, exact dimensions and acreage of the tax parcel(s) to be built upon; (3) Identification of the owners of all adjacent tax parcels; (4) Location and dimensions of the solar energy system; (5) A demonstration of compliance with all setback, screening and height requirements specified in section 17-23 above; (6) Existing and proposed locations and dimensions of any utility lines, easements, drainage ways and public or private rights-of-way; (7) Buildings and the locations of all structures, existing and proposed Prior to issuance of building permit, drainage plans must meet soil erosion, sedimentation and pollution control ordinance requirements; (c) A solar project permit applicant shall submit a decommissioning plan to the county for review and approval. The decommissioning plan shall include, at a minimum: (1) Defined conditions upon which decommissioning will be initiated (e.g. end of lease, condition of a potential public safety hazard, etc.); (2) Removal of all non-utility owned equipment, conduits, structures, fencing, roads and foundations (and/or a written waiver signed by the property owner releasing the solar project developer from this requirement or a portion thereof); (3) Restoration of the property to a condition prior to development of the solar project (and/or a written waiver signed by the property owner releasing the solar project developer from this requirement or a portion thereof); (4) The timeframe and costs for completion of decommissioning activities; and (5) A signed statement from the party responsible for completing the decommissioning activities acknowledging such responsibility. (d) Within 15 business days of receiving the site plan and decommissioning plan, the county shall approve, approve with conditions (limited to those conditions necessary to ensure compliance with the setback, screening, and height requirements specified in this solar energy development ordinance), or disapprove the application due to failure to comply with the application requirements specified above. The county shall notify the applicant in writing either that the application has been approved, approved with conditions, or disapproved, with the specific reasons for conditional or disapproval. ## History (Ord. of 6-16-2020)