(a) Master meters. (1) Multi-family buildings. Water service shall be furnished to multi-family buildings through master meters and shall be charged at the appropriate rates established in the schedule of rates, fees, and penalties. To ensure that the installation meets the standards and specifications of the county water and sewer department ("department") and does not compromise the water system, water line and meter installation must be pre-approved by the water and sewer superintendent before the county will provide water service. All costs incurred for such installations shall be borne by the owner of the multi-family building, not the county. (2) Mobile homes in mobile home parks. a. Mobile home parks in existence as of November 7, 2023 which furnished water service through master meters may continue to do so according to the county's standards and specifications or may instead choose to furnish water service to mobile home parks through meters to each residential unit as specified below and in accordance with the county's standards and specifications. b. For those mobile home parks in existence as of November 7, 2023, which furnish water through a master meter, residential end-users may disconnect their residence from the master metered water system provided that each such end user of a residential unit within the mobile home park or the owner of the mobile home park has installed a separate line to the county's public right-ofway and installed a water meter in the county's public right-of-way for each such residential unit To ensure that the installation meets the standards and specifications of the department and does not compromise the water system, water line and meter installation must be pre-approved by the. water and sewer superintendent before the county will provide water service. All costs incurred and permissions or rights necessary to route and install such water lines to and meters in the county right-of-way shall be the obligation of the residential end-users or the mobile home park owner, not the county. c. Alternatively, for those mobile home parks in existence as of November 7, 2023, which furnish water through a master meter, residential end-users may, with the written consent of the mobile home park owner, make application with the department for the installation of water meters connected directly to their residences and the existing master meter water system. If the owner of the mobile home park has consented in writing to one residential end-user's water meter for one residence, the mobile home park owner may not withhold its consent to any other residential end-user. When the mobile home park owner has granted said consent and the department accepts the application as valid, the county at its own expense will install an individual meter for each such residential applicant within the mobile home park. To ensure that the installation meets the standards and specifications of the department and does not compromise the water system, water line and meter installation must be pre-approved by water and sewer superintendent before the county will provide water service. The department shall adjust the master-meter water bills for the mobile home park owner to account for the water bills issued to each residential end-user with its own individual water meter. The department reserves the right to terminate water service, turn off or disconnect individual water meters from the water system at the meter for failure to pay water bills. The owner of the mobile home park shall be responsible for the repairs and maintenance of the water lines and water loss in the mobile home park; provided, however, where the needed repair exists or the water loss occurs in a privately owned mobile home, then such repair or water loss shall be the responsibility of such privately owned mobile home. d. For mobile home parks platted and constructed after November 7, 2023, the mobile home park owner at its costs shall install water lines and meters to each mobile home unit and, if the meters are not located within the county's public right-of-way, grant an easement to the county to access the park and install, replace, repair, and maintain, dedicated public water lines and water meters. To ensure that the installation of public water lines and meter meet the standards and specifications of the department and do not compromise the water system, public water line and meter installation must be pre-approved by the water and sewer superintendent before the county will provide water service. e. All water service furnished to mobile home parks with master meters or end-users with individual meter shall be charged at the appropriate rates established in the schedule of rates, fees, and penalties. (3) Commercial developments with multiple tenants shall be metered according to the county's standards and specifications and shall be charged at the appropriate rates established in the schedule of rates, fees, and penalties. (4) If private easements and/or agreements are necessary, they should be established or acquired accordingly and are not the responsibility of the county. (5) Water service shall be billed by the county and the responsible party shall pay for all charges contained in such bills. (6) Multi-family developments, mobile home parks and commercial development buildings shall comply with state laws and regulations regarding submetering, reporting requirements to regulatory agencies, Georgia State Minimum Standard Plumbing Code, Georgia Rules for Safe Drinking Water (GA Rules and Regulations 391-3-5- .13), and any other requirements of the state. Meeting these requirements is solely the responsibility of the customer and the county bears no responsibility in this regard. (7) Any deviation from master metering configuration, or costs associated with a change in configuration to serve development, shall be at the sole expense of the customer and approved by the county. (8) Existing developments will be evaluated for need of master metering upon submission of plans to upgrade, retrofit or alter existing facilities. (9) If any development is master-metered, said development may be considered a public water system per the Georgia Rules for Safe Drinking Water, chapter 391-3-5, and may be subject to additional regulations and monitoring requirements in accordance with the Safe Drinking Water Act. The county bears no responsibility for the creation of such a system. (b) Fire line meters. (1) The necessity of a fire line shall be determined by code enforcement and fire marshal. (2) All fire lines must be metered as detailed in the county's standards and specifications. (3) If any existing unmetered fire line should demonstrate continuous consumption, the customer may be required to retrofit the fire line with an appropriate metering system. (4) Existing developments will be evaluated for need of fire line metering upon submission of plans to upgrade, retrofit or alter existing facilities. (c) Industrial evaporation and process water. (1) Whenever an industrial customer uses significant quantities of metered water, as described in the county's standards and specifications, which is not discharged into the county's sewer system, the customer may request a credit for the water not being discharged into the sewer system. (2) It is the responsibility of the customer to provide documentation, drawings, or schematics sufficient for an accurate determination of water that does not enter the county's sewer system. All metering equipment, installation arrangement, and calibration requirements must comply with the county's standards and specifications. (3) It is the sole discretion of the county to determine if any credits will be granted. The water and sewer superintendent has the authority to assess additional fees due to the requested special services. Such fees shall be established by the board of commissioners from time to time and included in the schedule of rates, fees, and penalties. (4) In order to qualify for credits, the customer must comply with all county requirements, in addition to all local and state plumbing codes.