Indicator posts of sufficient construction and taller than the highest point of each pile shall be installed. Indicator posts shall be marked at readily recognizable 5-foot increments so as to give visual height references at or near the highest point(s) of each pile. The posts shall not be positioned so as to interfere with access to the piles.