--- title: Barrow County Code of Ordinances, Sec. 70-81. Petition process collection: local-codes id: local-code:barrow-county/code/70-81 cite_as: Barrow County, Ga., Code of Ordinances § 70-81 canonical_url: https://georgiacommons.org/counties/barrow/code/70-81 md_url: https://georgiacommons.org/counties/barrow/code/70-81.md text_url: https://georgiacommons.org/counties/barrow/code/70-81/text source_url: https://library.municode.com/ga/barrow_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:barrow jurisdiction_name: Barrow County county_fips: "13013" corpus_version: local-codes-barrow-county-4325bd144603 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/barrow/code/~part-ii/~chapter-70/~article-iv.md previous: https://georgiacommons.org/counties/barrow/code/70-80.md next: https://georgiacommons.org/counties/barrow/code/70-82.md index: https://georgiacommons.org/counties/barrow.md branch: code edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:barrow-county/code/70-81@2026-11-23-02618ec169 --- # Barrow County Code of Ordinances, Sec. 70-81. Petition process > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 70 - ROADS / Article IV - SPEED CONTROL DEVICES PROGRAM To have speed control devices considered for installation on county-maintained neighborhood roads, a petition must be submitted to the transportation division of the public works department. (a) Contact transportation division for petition paperwork. (b) For subdivisions not built out or complete, a minimum of 60 percent of the total units must be occupied before a petition may be considered. (c) All property owners in the subdivision should be contacted and given the opportunity to sign the petition, indicating their "yes" or "no" concerning the installation of speed control devices. (d) Only the signature of the legal owner of the property will be proper for the purposes of the petition. (e) All property owners must sign individually, including the owners of undeveloped lots. (f) If a property is jointly owned by a married couple, both signatures are required (e.g. a "Mr. & Mrs." signature is not acceptable). (g) Multiple owners must all indicate a "yes" on the petition in order for a "yes" vote to count for that lot. (h) Renting tenants are not an acceptable substitute for the legal property owner. (i) Each lot counts as one vote, regardless of the number of owners signing. (j) At least 80 percent of the property owners must be in favor of speed control devices for petitions to be considered. (k) The completed petition must be submitted to the Transportation Division of the Public Works Department, where it will be checked against tax records and land lot maps to insure that it meets all requirements. (l) For petitions that do meet the requirements, the Transportation Division will conduct a preliminary field inspection to consider the road geometry. If the street, grade, and other fixed factors do not meet the necessary requirements for consideration of speed control devices, the initial request will fail and no further action will be taken. If the street, grade, and other fixed factors qualify for the Speed Control Devices Program, a traffic engineering study will be conducted to determine whether the subject street meets the criteria for the installation of speed control devices. (m) In the case of a petition that fails to meet the requirements set forth herein, property owners must wait one year from the date of the initial request before requesting another study of the same street(s). ## History (Ord. of 2-8-2022, § 1(Exh. A))