--- title: Barrow County Code of Ordinances, Sec. 90-119. Determination of wastewater volume collection: local-codes id: local-code:barrow-county/code/90-119 cite_as: Barrow County, Ga., Code of Ordinances § 90-119 canonical_url: https://georgiacommons.org/counties/barrow/code/90-119 md_url: https://georgiacommons.org/counties/barrow/code/90-119.md text_url: https://georgiacommons.org/counties/barrow/code/90-119/text source_url: https://library.municode.com/ga/barrow_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:barrow jurisdiction_name: Barrow County county_fips: "13013" corpus_version: local-codes-barrow-county-4325bd144603 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/barrow/code/~part-ii/~chapter-90/~article-iv.md previous: https://georgiacommons.org/counties/barrow/code/90-118.md next: https://georgiacommons.org/counties/barrow/code/99-120.md index: https://georgiacommons.org/counties/barrow.md branch: code edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:barrow-county/code/90-119@2026-11-23-cc87a56593 --- # Barrow County Code of Ordinances, Sec. 90-119. Determination of wastewater volume > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 90 - UTILITIES / Article IV - SEWER USE Unless otherwise provided, the volume of wastewater delivered to the POTW will be based upon the quantity of water purchased from and metered by the customer's water provider. If the volume of water delivered to the POTW is greater or less than the volume purchased from the provider, the user shall make known to the county such differences. If differences do exist, it shall be the obligation of the user to install county-approved meters or other devices to determine the portion or quantity of wastewater delivered to the POTW. At locations readily accessible for meter reading by the county, separate water meters installed in the county right of way are preferred for measuring non-sewered consumptive water usage. The county may consider establishing a constant ratio, factor or percentage to be applied to the metered water quantity delivered by the water system in order to determine the waste delivered by the industry. Determining, as well as justifying, the factor to the county will be the responsibility of the user. The value of this factor may be periodically reviewed for accuracy by the county. Other methods may be established by the county to estimate the quantity of wastewater released to the sanitary sewer, which considers the amount of water consumed during different seasons. Users which claim wastewater volumes to be inaccurately determined by these methods shall bear the expense of installing county-approved meters to estimate flows to the POTW more accurately. ## History (Ord. of 3-27-2001, § 9)