Construction of industrialized homes is regulated by the Georgia Department of Community Affairs and not this article. However, installation of homes must meet manufacturer's specifications and the specifications of the zoning ordinance before permanent utilities may be CD18:15 Supp. No. 10 installed. An installation permit must be obtained prior to installation and an inspection must occur of the installation, including utility connections and foundation, prior to issuance of a certificate of occupancy. (1) Installation requirements. Industrialized homes must be installed in accordance with O.C.G.A. ยง 8-2-110 et seq. and regulations promulgated thereunder. (2) Utility connections. Utility connections prior to the final inspection of the installation will be considered temporary and will be approved only when arrangements for complete installations have been made. (3) Entry landing. All industrialized home installations shall provide an adequate means of entry (including steps and a landing at each doorway). (4) Sewage management. A septic permit or a sewer tap must be secured and provided to building inspections before an installation permit for an industrialized home will be permitted. (5) Foundations. The dwelling must be placed on a foundation and a curtain wall, unpierced except for required ventilation and access, must be installed so that it encloses the area located under the home to ground level. Such a wall shall have a minimum thickness of four inches and shall be constructed of masonry or similar material as approved by the building official.