Bartow County · Code of Ordinances
Chapter 18 - BUILDING CODE / Article II - BUILDING CODE / Division 6 - APPLICATION REQUIREMENTS; DRAWINGS AND SPECS
Sec. 18-201. Application requirements.
About this text
- As published by Municode, current through 2026-09-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Each application for a permit, along with the required fee, shall be filed with the building official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location. The application shall be signed by the owner, or his authorized agent. The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure. The application shall provide such information as is required to confirm compliance with this chapter and applicable codes, and shall be accompanied by drawings or site plans as are required for these purposes. The applicant is advised that special agricultural setback provisions exist in the Bartow County Zoning Ordinance, and that other requirements contained in the Bartow County Development Regulations, the Bartow County Flood Damage Prevention Ordinance, and the Bartow County Soil Erosion and Sedimentation Ordinance may apply, and the applicant is advised to check with the zoning department and engineering department. Issuance of a building permit is not a guaranty that the erection of the structure is lawful and in compliance with all other applicable ordinances.
History
(Ord. of 1-3-2007(1))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.