Skip to content
Georgia Commons
Menu

Bartow County · Code of Ordinances

Chapter 18 - BUILDING CODE / Article II - BUILDING CODE / Division 8 - INSPECTIONS

Sec. 18-281. Generally.

About this text

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Before issuing a permit, the building official shall examine or cause to be examined any building, electrical, gas, mechanical or plumbing system for which an application has been received for a permit to enlarge, alter, repair, install, or change the occupancy of an existing building. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the standard building codes. A final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion.

History

The history line the source prints at the end of the section.

(Ord. of 1-3-2007(1))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bartow-county/code/18-281@2026-09-02-602fb489d6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bartow County Code of Ordinances, Sec. 18-281. Generally | Georgia Commons