--- title: Bartow County Code of Ordinances, Sec. 34-63. Construction stage submittal requirements collection: local-codes id: local-code:bartow-county/code/34-63 cite_as: Bartow County, Ga., Code of Ordinances § 34-63 canonical_url: https://georgiacommons.org/counties/bartow/code/34-63 md_url: https://georgiacommons.org/counties/bartow/code/34-63.md text_url: https://georgiacommons.org/counties/bartow/code/34-63/text source_url: https://library.municode.com/ga/bartow_county/codes/code_of_ordinances date: 2026-09-02 status: active jurisdiction: county:bartow jurisdiction_name: Bartow County county_fips: "13015" corpus_version: local-codes-bartow-county-2bbbd1ef676d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/bartow/code/~chapter-34/~article-ii/~division-4.md previous: https://georgiacommons.org/counties/bartow/code/34-62.md next: https://georgiacommons.org/counties/bartow/code/34-64.md index: https://georgiacommons.org/counties/bartow.md branch: code edition: As published by Municode, current through 2026-09-02 edition_date_kind: current_through source_publisher: Municode version_id: local-code:bartow-county/code/34-63@2026-09-02-a47826f27c --- # Bartow County Code of Ordinances, Sec. 34-63. Construction stage submittal requirements > As published by Municode, current through 2026-09-02 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 34 - ENVIRONMENT / Article II - FLOODPLAIN MANAGEMENT/FLOOD DAMAGE PREVENTION / Division 4 - PERMIT PROCEDURES AND REQUIREMENTS For all new construction and substantial improvements on sites with a floodplain management/flood damage prevention plan, the permit holder shall provide to the county engineer three certified FEMA elevation certificates: (1) Prior to construction (2) as-built certificate including the lowest floor elevation immediately after the lowest floor is completed or flood-proofing certificate for non-residential construction, including floodproofing level immediately after flood-proofing is completed (3) A final FEMA elevation certificate shall be provided after completion of construction including final grading and drainage improvement of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood-proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to approval of these certifications shall be at the permit holder's risk. The county engineer shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop work order for the project. ## History (Ord. of 10-10-2007, § 403)