Skip to content
Georgia Commons
Menu

Bartow County · Code of Ordinances

Chapter 34 - ENVIRONMENT / Article II - FLOODPLAIN MANAGEMENT/FLOOD DAMAGE PREVENTION / Division 4 - PERMIT PROCEDURES AND REQUIREMENTS

Sec. 34-64. Duties and responsibilities of the administrator.

About this text

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Duties of the county engineer shall include, but shall not be limited to:

(1) Review all development applications and permits to assure that the requirements of this ordinance have been satisfied and to determine whether proposed building sites will be reasonably safe from flooding;

(2) Require that copies of all necessary permits from governmental agencies from which approval is required by federal or state law, including but not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972,33 U.S.C. 1334, be provided and maintained on file;

(3) When base flood elevation data or floodway data have not been provided, then the county engineer shall require the applicant to obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to meet the provisions of division 5 and 6;

(4) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures;

(5) Review and record the actual elevation, in relation to mean sea level to which any substantially improved structures have been flood-proofed;

CD34:18.1 Supp. No. 14

(6) When flood-proofing is utilized for a non-residential structure, the county engineer shall obtain certification of design criteria from a registered professional engineer or architect;

(7) Notify affected adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA);

(8) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (e.g., where there appears to be a conflict between a mapped boundary and actual field conditions) the county engineer shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. Where floodplain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps;

and,

(9) All records pertaining to the provisions of this article shall be maintained in the office of the county engineer and shall be open for public inspection.

History

The history line the source prints at the end of the section.

(Ord. of 10-10-2007, § 404)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bartow-county/code/34-64@2026-09-02-9dc265f09f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bartow County Code of Ordinances, Sec. 34-64. Duties and responsibilities of the administrator | Georgia Commons