(a) Studied "A" zones, as identified in the FIS, shall be used to establish base flood elevations whenever available. (b) For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be provided by the engineering department. If future-conditions elevation data is not available from the engineering department, then it shall be determined by a registered professional engineer using a method approved by FEMA and the engineering department. See section 34-77 for further requirements. (3) The boundaries or limits of the floodplain are shown within 0.5 feet vertical accuracy on the development plan containing existing topographic information.