(a) The width of a floodway shall be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be provided by the engineering department. If floodway data is not available from the engineering department, then it shall be determined by a registered professional engineer using a method approved by FEMA and the engineering department. (b) Developments or subdivisions. If the request involves a development or subdivision, the developer or subdivider shall either pay for the county to conduct the study, or shall pay an impendent consultant to provide the data, provided that consultant is first approved by the county engineer. If floodway data is provided by the county, the developer or subdivider shall pay the pro rata share of the costs of the consultant to map the relevant basin. (c) Individual lots. If the request involves an individual lot not part of a larger common plan of development, or a pre-existing lot in an existing subdivision, then the individual shall consult with the county engineer. The county engineer shall make the determination whether to require additional floodway data at the applicant's expense, to expedite county mapping of the relevant area, or to accept the existing data as sufficient.