Sec. 72-34. Provisions for the protection of the public.

About this text

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Safety procedures; securing work site. The use of the right-of-way shall be minimized to the greatest possible extent. No materials or equipment shall be stored on the right-of-way without prior written approval. No work shall restrict the sight distances for motorist exiting adjacent streets or driveways unless a flagman is provided. Minimum distances of lane closures to protect the safety of the work crews and the general public shall be provided by the Bartow County Community Development Department. Closure of lanes and traffic flow, and other relevant safety measures, shall be conducted in accordance with the current edition of the Uniform Manual on Traffic Control Devices, latest edition, as well as the DOT Utility Accommodation Policy and Standards manual, latest edition. Debris shall not be placed on the right-of-way, but will be hauled away as the excavation occurs. All trenches opened each day must be backfilled and compacted to 95 percent standard proctor using appropriate tamping or vibratory equipment unless otherwise approved by the department. The department reserves the right to require compaction testing from the utility, at the utility's expense, for any work involving cutting, trenching, or backfilling in the roadbed. Any postings must be properly posted and maintained so they are legible. All work areas must be secured at the end of each workday to protect the general public. Cover plates for gaps in the roadway must be secured at the end of each workday. Plates must be secured so that there is no possibility that the plates can move or shift due to traffic flow. No open cuts shall be allowed after work has stopped.

(b) Indemnification. The utility receiving the permit and the contractor shall indemnify and hold harmless Bartow County, the department and all county employees, and agents, from any and all liability resulting from any work performed under the permit or with written notification in a county right-of-way, as provided in the current edition of the state D.O.T.'s Utility Accommodation Policy and Standards. The utility shall also indemnify the county from any claims, suits or causes of action resulting from any work under the permit or pursuant to written notification. These terms shall become terms of and contained within the permit/ permit application and/or special assurances form(s). Such indemnification shall include the costs of attorneys' fees and litigation expenses to enforce this indemnification provision.

(c) Warranty. The utility shall provide a one-year warranty for any work conducted under authority of this article including any new installation and any repair work. The one-year warranty shall commence upon the completion of the work. The warranty shall be supported by a surety in the case of a utility permit, or by the utility owner in the case of actions requiring written notification. The utility shall be responsible to repair any defects in the work or repair, or correct any deficiencies that are not up to the standards and regulations of the county ordinances.

(d) Surety. Surety shall be required for work under this article, as specified herein, to ensure performance of the repair in compliance with the standards and regulations of the county and specifically to ensure that roads are repaired properly. Surety shall be in the nature of a performance and maintenance bond, an irrevocable standby letter of credit, or an escrow deposit.

(1) Form. The surety shall only be issued in a form approved by Bartow County. The language of the surety and the term of the surety must be approved by Bartow County prior to issuance. Bartow County has forms it prefers that surety companies use, and those can be provided upon request; otherwise, the form of the surety shall be approved by the county prior to acceptance of the surety. Any irrevocable standby letter of credit or surety bond shall be issued by a company or financial institution authorized to do business in the State of Georgia. Irrevocable standby letters of credit shall be issued in accordance with the current International Chamber of Commerce (ICC) publications governing such letters of credit, and must be issued by a bank having a physical branch in Bartow County, which shall be the place of tender of the draft on said letter of credit.

Bartow County reserves the right to demand a specific form of surety from a developer that has tendered unsatisfactory surety in the past. Bartow County reserves the right to reject a surety from a financial institution or insurance company that has provided an unsatisfactory surety in the past. Escrow shall mean deposit of good funds in a bank of Bartow County's choosing pursuant to escrow instructions issued by Bartow County.

(2) Amount. Surety shall be in an amount determined by the community development department based on the size of the project. The minimum surety for a utility permit shall be $25,000.00. The department may use its discretion when setting the amount of the bond and should consider potential damage to public property or facilities and the relationship to the cost of installation, as well as the factors used in determining whether a project is complex.

(3) Prerequisite; calling surety. No permit shall be issued by the community development department until the surety has been furnished to the county, in a form acceptable to the county. If the developer does not comply with these regulations, other applicable Bartow County Ordinances and regulations, or with the conditions of the permit after issuance, the county may call the surety, or any part thereof, to be forfeited and may use the proceeds to perform the work or hire a contractor to remedy the defects, whether that means installing soil erosion and sedimentation prevention measures, completing paving and road work, or completing other work.

(4) Waiver. The community development department shall be authorized, but not required, to reduce or waive the surety requirement for projects undertaken by a municipal government in the county. The surety requirement may also be waived by the department head's discretion, for utilities that have demonstrated a history of compliance with this article, financial responsibility, quality work, and prompt responsiveness.

CD72:9 Supp. No. 6

(e) Insurance. All utilities operating in county right-of-ways shall also provide proof of liability insurance in the amount of $1,000,000.00 in general liability coverage that shall also cover the actions of the contracts and subcontractors. In lieu of the foregoing, the utility may self-insure for the above-referenced coverages. The utility shall present valid proof of self-insurance upon the department's request. The utility shall also require equivalent insurance from their contractors or subcontractors.

History

The history line the source prints at the end of the section.

(Ord. of 5-4-2006; Ord. of 9-10-2008, § I; Ord. of 9-11-2013, § I)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.