Bartow County · Code of Ordinances
Chapter 74 - WATER AND SEWER / Article III - SEWER SERVICE / Division 3 - PRETREATMENT OF WASTEWATER
Sec. 74-304. Hauled wastewater.
About this text
- As published by Municode, current through 2026-09-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Septic tank waste may be introduced into the POTW only at locations designated by the superintendent, and at such times as are established by the superintendent. Such waste shall not violate the general sewer use requirements of this article. Septic tank waste haulers shall be required to obtain wastewater discharge permits from the superintendent.
(b) The superintendent shall require haulers of industrial waste to obtain wastewater discharge permits. The superintendent also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this article.
(c) Industrial waste haulers may discharge loads only at locations designated by the superintendent. No load may be discharged without prior consent of the superintendent. The superintendent may collect samples of each hauled load to ensure compliance with applicable standards. The superintendent may require the industrial waste hauler to provide a waste analysis of any load prior to discharge.
(d) Industrial waste haulers must provide a waste tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes.
History
(Ord. of 12-17-2003(2), § 22)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.