Bartow County · Code of Ordinances

Chapter 74 - WATER AND SEWER / Article III - SEWER SERVICE / Division 6 - REPORTING REQUIREMENTS

Sec. 74-371. Baseline monitoring reports.

About this text

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the superintendent a report which contains the information listed in subsection (b) below. At least 90 days prior to commencement of their discharge, new sources, and sources that have become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the superintendent a report which contains the information listed in subsection (b), below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.

(b) Users described above shall submit the information set forth below:

(1) Identifying information. The name and address of the facility, including the name of the operator and owner.

(2) Environmental permits. A list of any environmental control permits held by or for the facility.

(3) Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user.

This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.

(4) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e).

(5) Measurement of pollutants.

a. The categorical pretreatment standards applicable to each regulated process.

b. The results of sampling and analysis identifying the nature and concentration and/or mass, where required by the standard or by the superintendent, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long term average concentrations or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 74-379 of this article.

c. Sampling must be performed in accordance with procedures set out in section 74-380 of this article.

(6) Certification. A statement reviewed by the user's authorized representative and certified by a qualified professional indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements.

(7) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M will be required. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in this section.

(8) Signature and certification. All base line monitoring reports must be signed and certified in accordance with section 74-325 of this article.

History

The history line the source prints at the end of the section.

(Ord. of 12-17-2003(2), § 36)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bartow-county/code/74-371@2026-09-02-3ed7aa4de2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bartow County Code of Ordinances, Sec. 74-371. Baseline monitoring reports | Georgia Commons