In reviewing a development, meaning any construction of a residential or nonresidential use, and including any redevelopment of any of the foregoing, the following charges shall apply: (1) Plan review fee. A plan review fee shall be imposed for each new set of plans reviewed or each new version of plans reviewed. "Plans" includes preliminary plans, construction plans, and as-builts (final plans). (2) Flow tests. A request for a fire flow test to be performed will require the payment of a fee per test. (3) Inspection fees. Inspection fees shall be imposed on any newly installed water and sewer infrastructure (including but not limited to, lines, tanks, connections, pumps, valves, and other appurtenances related to water and sewer infrastructure). (4) Filling and flushing charges. Water usage for filling and flushing the water system shall be billed per thousand gallons. Volume for pipes shall be calculated by multiplying the volume of the pipes by four. Volume for tanks shall be calculated based on the actual number of times the tank is filled (i.e., actual water used). (5) Temporary construction/hydrant meters. All water usage from a fire hydrant other than bona fide emergency purposes shall have the water metered through a hydrant meter and billed for the proper charges. (6) Responsibility for payment. It shall be the responsibility of each developer to bear the full expense of installing required service lines to and within the developers' property for the existing system in a manner as approved by the county water and sewer system, under the provisions of the county water department development procedures. No building permits shall be issued in any development until the water department has issued final approval of water and sewer systems.