County: Bartow County
Bartow County Commissioner meeting, December 4, 2024
9 pages
Georgia Commons is independent and is not affiliated with Bartow County Commissioner.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesApproved 12/4/2024 (www.bartowcountyga.gov) · shown on this page
AI summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioner adopted the Hwy. 411 Tax Allocation District and Redevelopment Plan and denied a 715-acre rezoning for a limestone quarry.
The sole commissioner held a hearing and meeting on the Highway 411 Redevelopment Plan and approved a wide range of items. He adopted Tax Allocation District #3 and the Redevelopment Plan for the Hwy. 411 Corridor, approved amendments to the alcohol ordinance, and approved a $300,000 contract with VHB for a Safety Action Plan. He also approved Declarations of Taking for the Burnt Hickory Road/Sugar Valley Road intersection project, plus several agreements, rezonings, and a zoning text amendment. After a long hearing with many speakers, he denied the 715.4-acre rezoning for an open-pit limestone mine at Hwy. 140, agreeing with the Planning Commission. A rezoning request for 833 Hwy. 293 was tabled at the applicant's request until the December 4th meeting.
Topics taken up: Hwy. 411 Tax Allocation District; Georgia Stone limestone quarry rezoning; Alcohol ordinance amendments; Safety Action Plan contract with VHB; 2026 SPLOST referendum results; Grassdale Road rezoning; Hwy. 411 townhome PUD rezoning; Zoning ordinance text amendments; Development authority appointments; Declarations of Taking Burnt Hickory Road.
Decisions the minutes record (13)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Tax Allocation District #3 and Hwy. 411 Corridor Redevelopment Plan
The minutes: “Commissioner Taylor approved and adopted the Tax Allocation District #3 and the Redevelopment Plan as presented.”
Rezoning of 715.4 acres at Hwy. 140, Bunch Mountain Road, McKenna Road for open-pit limestone mining (Georgia Stone Products)
The minutes: “That’s why I agree with the Planning Commission. This application is denied.””
Contract with VHB for Safety Action Plan, $300,000
The minutes: “Commissioner Taylor approved and authorized the contract with VHB as presented in the amount of $300,000.00.”
Amendments to the County Alcohol Ordinance on expiration of license applications for proposed locations
The minutes: “Commissioner Taylor approved and adopted the amendment as presented.”
Three Declarations of Taking for the Burnt Hickory Road/Sugar Valley Road intersection project
The minutes: “Commissioner Taylor approved and authorized the Declarations of Taking as presented.”
Rezoning of 31.4 acres at 987 and 991 Grassdale Road to R-8 for a 69-unit single-family development
The minutes: “Commissioner Taylor approved the application as presented.”
Rezoning of 35 acres at 5233 Hwy. 411 from I-1 to PUD for commercial area and about 204 townhomes
The minutes: “Commissioner Taylor approved the application with the conditions as stated.”
Zoning Ordinance amendments on R-1 infill, signs, reapplication time after denial, and zoning conditions (Z-24-00054)
The minutes: “Commissioner Taylor approved the amendments as presented.”
Agreement with City of Acworth for solid waste transfer to the Bartow County Landfill
The minutes: “Commissioner Taylor authorized an Agreement with the City of Acworth for the transfer of solid waste to the Bartow County Landfill.”
Cyber Security Grant funding agreement of $54,000
The minutes: “Commissioner Taylor approved and authorized the funding agreement as presented.”
24 alcohol license applications and renewals for FY2025
The minutes: “Commissioner Taylor approved 24 Alcohol License applications and renewals for FY2025.”
License Agreement with Lennar Georgia, LLC for access to County property at 10 Ladds Mountain Road
The minutes: “Commissioner Taylor approved a License Agreement with Lennar Georgia, LLC related to the planned development of the Ladds River Subdivision.”
Automatic Aid Fire Service Agreement renewal with Polk County
The minutes: “Commissioner Taylor approved the renewal of an Automatic Aid Fire Service Agreement with Polk County.”
Ask about this meeting
The chat reads this meeting's minutes, in full, and answers only questions about them. It does not read the AI summary above.
Meeting minutes
Agenda items (5)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
As posted on www.bartowcountyga.gov, read November 26, 2026. Nothing below is written by Georgia Commons.
MINUTES
PUBLIC HEARING AND MEETING
BARTOW COUNTY COMMISSIONER
November 13, 2024 - 10:00 a.m.
PUBLIC HEARING:
• A public hearing was called to order at 10:00 a.m. to present and discuss the proposed Highway 411 Redevelopment Plan and Tax Allocation District. County Attorney Boyd Pettit presented the Plan and allowed those in attendance that wished to speak an opportunity to do so. There were no questions or comments from the audience. The Hearing adjourned at 10:02 a.m.
MINUTES:
• After calling the Public Meeting to order, Commissioner Taylor approved the minutes of the October 2
nd Public Meeting as presented.
ALCOHOL LICENSES & PERMITS
• Community Development Director Brandon Johnson presented amendments to the County’s Alcohol Ordinance. Mr. Johnson noted that the State has a requirement that two liquor stores cannot be within 1500 feet of one another. There have been some calls for competing businesses trying to get certain locations. The amendment that was passed last year was a little too restrictive for a business that was already in the works with getting a business license and building permit. The staff is asking to amend that again to give more flexibility to businesses that are already in the process and to restrict someone from getting a license to hold a certain location for three or four years without actually starting the process. The amendment will provide an expiration for alcohol license applications for proposed locations where a building does not currently exist. Commissioner Taylor approved and adopted the amendment as presented.
• Commissioner Taylor approved 24 Alcohol License applications and renewals for FY2025.
APPOINTMENTS:
• After remembering the recent passing of Mr. Larry Holt of Holt’s Pharmacy for over 27 years of service to the Community and having served as one of the County’s representatives on a number of Development Authorities for many years, Commissioner Taylor made the following appointments to fill Mr. Holt’s vacant seats.
o Leah Harper will replace Mr. Holt on the Bartow County Development Authority o Jessie Weaver will replace Mr. Holt on the Bartow-Cartersville Joint Development Authority
• Commissioner Taylor also re-appointed Jody Elrod to serve another term on the Department of Family and Childrens Services (DFCS) Board.
ENGINEERING & TRANSPORTATION:
• The following rights-of-way were added to the County’s Road System in order to provide for future road maintenance and improvements.
o An additional 10 feet of right-of-way along a section of Old Alabama Road (Tax Parcel # 0030- 1062-002).
o An additional 10 feet of right-of-way along a section of Folsom Glade Road (Tax Parcel #0065- 0151-017).
o An additional 10 feet of right-of-way along a section of Bill Nelson Road (Tax Parcel #0029- 0773-009).
o An additional 15 feet of right-of-way along a section of Powell Road (Tax Parcel #0064-0118- 008).
• Transportation Director Tom Sills presented a contract with Vanasse Hangen Brustlin, Inc. (VHB) to prepare a Safety Action Plan for the Safe Street for All project. The County received four proposals from reputable engineering firms to perform a study of the history of accidents on county roads and recommend correctional action to improve road safety. After reviewing and scoring the proposals submitted, VHB was deemed to be the best candidate for the project. Commissioner Taylor approved and authorized the contract with VHB as presented in the amount of $300,000.00.
• Attorney Brandon Bowen presented three Declarations of Taking for property acquisitions by the County in order to continue with the Burnt Hickory Road/Sugar Valley Road intersection project. Mr.
Bowen noted that these particular property owners are either not reachable or do not have the authority to reach an agreement with the County. Commissioner Taylor approved and authorized the Declarations of Taking as presented.
COMMUNITY DEVELOPMENT
• Attorney Boyd Pettit presented a Resolution to adopt the Tax Allocation District #3 and the Redevelopment Plan for the area, the area being commonly identified as the Hwy. 411 Corridor Redevelopment Area. Mr. Pettit referenced the long process involved in developing a Plan for the property, commonly referred to as the Aubrey property. “The property is located both in Bartow and Cherokee Counties. There are still negotiations taking place with regard to some of the areas, trying to maintain some conservation areas. I believe your plan required that 5,000 acres be set aside for conservation purposes. The Redevelopment Plan provides for the potential development of a little over 2,000 acres for industrial and commercial use, for residential housing, and for recreational areas. This is not something that will occur overnight. This will be a long-term development. This is an area of the County that this type of development is well suited for.” Commissioner Taylor commented that this project has gone through several meetings and went on to explain that the TAD allows tax abatements for every project developed within the District that increases the property value. The abatements have to be used for infrastructure improvements within the District area. It also allows the County to have a say in the future development of the area. Commissioner Taylor approved and adopted the Tax Allocation District #3 and the Redevelopment Plan as presented.
FINANCE & PUBLIC SERVICES:
• Commissioner Taylor executed a Resolution declaring the results of the 2026 SPLOST Referendum that was presented to Bartow County voters on November 5th
. According to County Administrator Peter Olson, the Referendum, having been approved by the voters with 57% approval, will allow for the continuation of a one percent sales and use tax and the issuance of general obligation debt by the County. This will allow the County to make infrastructure improvements to roads and water and sewer, to improve public safety, expand recreation facilities and opportunities, and the construction of a new administration building and parking deck. The SPLOST cannot be used to fund salaries or regular operational cost. It can only be used for Capital improvements.
• Commissioner Taylor authorized an Agreement with the City of Acworth for the transfer of solid waste to the Bartow County Landfill.
• A Juvenile Court Service Agreement with Jessie Bunce to provide treatment case management services for Family Treatment Court was approved as presented. This is a grant funded position.
• Incoming Clerk of Superior Court Josh Biddy presented a Mutual Funding Agreement for the Clerk of Court’s Technology funds. Commissioner Taylor approved the agreement as presented.
• County Grant Writer Brielle Shinall presented an agreement to receive and administer $54,000.00 in Cyber Security Grant funding to address cybersecurity risks and threats to the County’s multi-jurisdictional public safety network. Commissioner Taylor approved and authorized the funding agreement as presented.
PROPERTY:
• Commissioner Taylor approved a License Agreement with Lennar Georgia, LLC related to the planned development of the Ladds River Subdivision. The agreement allows the developer to access County owned property located at 10 Ladds Mountain Road in order to develop a connecting road from Euharlee Road to Burnt Hickory Road that will be located on the north side of the railroad, which will serve to improve traffic flow in the area.
• A Lease Agreement with the Bartow County Board of Health to use a County-owned facility, formerly occupied by the Good Shepherd Foundation, located at 66 Gilreath Road for the Health Department’s Center for Intellectual and Developmental Disabilities (formerly Woodright Industries) was approved as presented.
• The following items were deemed Surplus County property in order to properly dispose of in accordance with the law:
o 1996 International Mass Casualty Bus (Fire Department) o 2008 Ford F-150 (Solid Waste) o Miscellaneous File Cabinets (Facilities)
PUBLIC SAFETY
• Commissioner Taylor approved the renewal of an Automatic Aid Fire Service Agreement with Polk County. The agreement provides for the adjoining counties to assist in fire related emergencies within a certain radius.
WATER & SEWER:
• An Encroachment Agreement with CSX related to the County’s SR 20 Sewer Project was approved as presented.
ZONING:
Zoning Administrator Richard Osborne presented the November zoning applications:
• Z-24-00048; an application by William C. Wilson, Jr. requesting to change the Land Use Map and rezone 16.4 acres at 833 Hwy. 293. The applicant submitted a request to table the application to allow more time for engineering work. [The application will be tabled until the December 4th Public Meeting.]
• Z-24-00054; an application by the Bartow County Zoning staff to amend the Zoning Ordinance providing for R-1 infill/redevelopment with conditional use approval; to make revisions to the sign regulations; to make revisions to the time allowed to re-apply after a denial; and zoning conditions standards. The Planning Commission recommended approval of the revisions with a 6-1 vote.
Commissioner Taylor approved the amendments as presented.
• Z-24-00051; an application by Devin Riley, LLC requesting to change the Land Use Map and rezone
31.4 acres at 987 and 991 Grassdale Road. If approved, the property would change from Low Density Residential and Commercial to Low Density Residential on the Land Use Map. The zoning would change from R-1 and C-1 to R-8 to allow a 69-unit single-family home development. The Planning Commission approved the application with a 6-1 vote. Speaking for the applicant was Mr. Hank Dudek, 1325 Colderwood Court, Smyrna, Georgia. “This is a 69-unit single-family home development on approximately 31 acres. These are all single-family detached homes that will bring new residents to Bartow County. Minimum square footage will be 1800 sq. ft. for one story homes. Most of the homes will be two-story. Starting price will be low $400,000.” Speaking in opposition to the application was Mr. Russ Avery, 110 Rudy York Road, Cartersville. “This is going to change the character of the local area. This is a quiet farming area. They want to turn it into a dense urban area on a two-lane road. The road is not designed to carry the weight of the large construction equipment that will be brought in for the development. There are also safety concerns. This area is traversed with bike riders and horse riders.
There are four horse farms and one cattle farm in the area. There is a stream that floods the basements on Bishop Road in a heavy rain. These houses are going to sit on approximately ½ acre lots. How are you going to put septic tanks on these lots and have them drain sufficiently? This will reduce the property values of the homes in the area. The zoning is not consistent with the surrounding area. There are two places that are historical. There are currently 822 homes for sale in the County. Do we need more? There are 1226 apartments currently for rent in Bartow County. There were no more registered speakers.” Commissioner Taylor approved the application as presented.
• Z-24-00052; an application by Manor Restorations, LLC requesting a Land Use change and rezoning of a 35-acre tract located at 5233 Hwy. 411. The Land Use Map would change from Industrial to Residential/Mixed Use, while the zoning would change from I-1 to PUD for the intended purpose of developing a commercial area and approximately 204 townhomes. The Planning Commission recommended approval with a 7-0 vote, with the following conditions: 1) the development must be based on the submitted concept plan; 2) the development must be based on the submitted design guidelines. Speaking on behalf of the applicant was Mr. Karl Lutjens, Engineer with Goodwyn, Mills and Cawood. “This is a mixed development of commercial and townhomes. Due to the topography, the property is not suited for industrial use, so this is the next best thing. There were no speakers in opposition of the request.” Commissioner Taylor approved the application with the conditions as stated.
• Z-24-00053; an application by Georgia Stone Products, LLC requesting to change the Future Land Use Map and rezone 715.4 acres located at Hwy. 140, Bunch Mountain Road, McKenna Road from Rural Estate to Mining and from A-1 to M-1 to allow for an open-pit mining operation for the extraction and processing of limestone. Mr. Osborne reported that “the application has been before the Planning Commission four times and twice before the Commissioner. Each of the four times, the City of Adairsville has submitted a written letter of opposition. The applicant has added applicant proposed zoning conditions, with the most recent having thirteen proposed conditions, including well preventative measures and well incident procedures. There has been a lot of opposition in each of the four cases. There is mining property adjoining the property, but the majority of the property surrounding it is zoned and used for farming or residential or chicken houses. The Planning Commission again for the fourth time recommended denial of the application with a 4-3 vote.” There were several registered speakers. Speaker No. 1: Kevin Moore, 326 Roswell Street, Marietta, speaking for the applicant. “This property is adjacent to an existing mine that has been in existence for quite some time. The Future Land Use Map is a guide, but allows for change in conditions and circumstances. Commercial, residential subdivisions, industrial developments can go anywhere, but mines are unique in that they can only go where the material is, where God and geology has put the resources under the ground. This is demonstrated by the fact that there is a mine already there. The City of Adairsville approved and permitted a subdivision in the area, off 140 despite the fact that there is a mine already there. The concerns heard should have already occurred, because there is a mine already there. The applicant has proven that they are willing to go to lengths not undertaken or required by Vulcan. They are willing to come forward to assure the community that well water will not be affected.
They will protect this community from concerns that they have.” Speaker No. 2: Bart Boyd, 111 Cardinal Road, White. “Every time we have gone through this process, we have taken the concerns of the community back and have now addressed each of those concerns with these thirteen conditions. We have had community meetings. We brought experts to address all the questions: hydrogeology, traffic, economic concerns about housing values, as well as blasting vibrations. Georgia Stone operates four other quarries in the State of Georgia. Our safety record is world class. We don’t get people hurt. We exceed by a long shot the safety records of most in the industry. The buffer will be doubled, blasting will only occur between 10 and 2 on non-holiday weekends, once a month. The State Fire Marshal set a limit on vibration, and we rarely approach 15% of that limit. The buffer we are proposing will protect those neighboring structures from vibration. We will conduct a pre-operating survey of all 121 structures and wells within one mile of the facility and agree to monitor any of those structures where
there is a concern. In my 30 years of experience there has been 0 incidents that I have had to address, and many of those locations have a much smaller buffer area. There is a publishing of an annual report that we will deliver to the County and to any neighbor that would like to have this report. A traffic study was done. There will be 365 trips per day, that includes in an out, so half of that amount is the number of vehicles. We are offering to construct a turning lane and accel, decel lanes. Economic research of quarries that are environmentally and socially responsible show that these quarries do not have an economic impact on property values. The quarry doesn’t require additional water infrastructure.
We will pave the entire entrance road from shipping to 140. We will put in new technology to wash the wheels of the trucks so there is no carry out or tracking out on the interstate. Related to water concerns, so long as anyone within that one-mile radius will commit to a pre-operating survey and we discern that it is a functioning well, we will put up a $1 million bond that would cover the cost of any issues with their water, regardless of why it happened. We are confident that there will not be an effect on ground water. If there is a problem, we will respond within hours and provide an alternate water supply. We are so confident with our lack of effect on the water supply that we are willing to do that. Speaker No. 3:
Benjamin Black, 4372 Shallowford Industrial Pkwy., Marietta “is a professional geologist in the State of Georgia with 27 years of experience with these types of projects. The site is characterized by limestone, a carbonated rock type, that has the potential to have an impact on sinkholes, which can impact ground water or surface water. Georgia Stone has conducted a very detailed hydrogeological study of this site. I have reviewed the last six years of Vulcan’s annual reports that tells how much water went into the quarry from precipitation and ground water, how much of that water was used by the quarry operation and how much was returned to the pit. The vast majority of the water in their pit comes from precipitation. There are no known impacts to ground water and no known sinkholes on their property. Georgia EPD requires them to conduct ground water monitoring. There is approximately 86 acres of this [Georgia Stone] property that is located in the ground water recharge area. All of the plant and pit operations will remain outside of the ground water recharge area. Impacts to ground water, water wells, creeks and streams is of no concern in this area. There will be ongoing monitoring throughout the life of the quarry. If anything starts to become obvious that there is beginning to be an impact to ground water, we’ll know well ahead of time. It’s not going to be a catastrophic incident that someone’s well implodes. There is no evidence that that will happen. We have 40 years of experience to prove that. Georgia Stone has agreed to perform extensive inspections of adjacent wells within a one-mile radius, which is quite an undertaking, 121 wells to be inspected. Everything will be surveyed and everything that can be known about the wells will be. In the event something happens to a well, we will cover it, no matter the reason.” Speaker No. 4: Kenneth Westmoreland, 448 Crowe Springs Road, White, asked the Commissioner “to approve the quarry for multiple reasons, mainly the competitive pricing for consumers. These people will need rock for their chicken houses and farms. Also, the County gets a more competitive price for all the infrastructure projects. This quarry coming to Bartow County opens up some other opportunities for people in the industry. This will allow a more competitive bid pricing. They will employ 10-15 people. Bartow County citizens that pay Bartow County taxes should be able to provide for their families, let alone the other 15 employees that I’m responsible for.” Speaker No. 5: Clayburn Crump, 14 Cedar Lane, Adairsville “owns a four-house poultry farm. Change is inevitable. I want to make an informed decision. I talked to them several times and researched their company. I have never met with them when they did not listen to me. I got a good answer. When they could not give me an answer, they wrote that down and got back to me. Anyone that wanted to find out the information they offered was able to. My poultry farm has no county water. I am within that one-mile area of concern. I can use up to 8,000-10,000 gallons of water a day operating my poultry houses. I looked at their test wells. I looked into what that means, and I understand it and I have no problem or concern with my well going dry as a result of this quarry. I can hear Vulcan blasts, I can hear the sirens go off. I’ve never had cracks. I’ve never had vibrations where the windows rattle. I’ve never had concerns with my well. I have close friends that live right by Vulcan and they have never had a problem with their well. I’ve talked to people to find out what effects Vulcan has had on them. They
don’t have a problem with Vulcan. People are basing their worry on the unknown. Georgia Stone has done everything they can do to ensure a good community business that is community oriented. I appreciate ya’ll letting us come speak to you. That’s a privilege. From my prospective, the County is going to change and if you vote against this, that land will be used for something. We’ve got 700 acres here that will be tied up to create a greenspace and that greenspace will be here 50-75 years down the road and then our descendants will have the opportunity to decide what happens to that 700 acres of greenspace. Not only that, they’ll have a large freshwater lake. Water is very important when you consider planning. We can decide for the future today or we can look forward and say how do you want this county to look in 50 years. That’s important. Technology and what it will be by then will be something they need to decide for themselves. Can you use this water, Adairsville, to keep developing and growing? We don’t have a river or Lake Allatoona, but we do have a very large freshwater lake. I think we should trust them to do what’s best for them in 50-75 years. We need some competition. I use quite a bit [of rock] on my turnaround areas and my road entrance to my farm and you’re at their mercy.
This will broaden the economic base for the County. I would love to see the future generations decide for themselves. I appreciate your care for this County. I probably use more water on my farm than anyone else here. These people want to be a good part of the community.” Speaker No. 6: Adam Baker, 11 S. Gilmer Street, Cartersville also spoke in favor of the quarry. “There is a need for competition. I care how the county uses their money. The county stands to benefit a lot by the competition.
Competition helps everybody. Typically, the people that complain, it’s the people that are right in their back yard. There is a silent majority of people out there that see the need for this in this County, they just don‘t come out and speak. If I had free reign to pick a spot in this county for a quarry, where would I put it? It’s got to be where God put the rock, it needs to be next to a major highway, it needs to be a safe distance from neighbors, it needs to have a lot of greenspace. It checks all the boxes. Then if you add all the conditions that have been included in the application, with the 1000 ft. buffer, a fund that protects wells, with the safety measures in place, and it’s right by an existing quarry…to me this just makes sense.” Speaker No. 7: Lester Tate, III, 11 Public Square, Cartersville, representing Beth Lewis and the Stop the Quarry group. I would like to ask those here that oppose the quarry to raise their hands.
This is the first time in my career as a practicing attorney that I have been to the courthouse six times to argue the same case. This application started in 2021 when the Planning Commission recommended denial 6-0. They withdrew their petition prior to coming here [before the Commissioner]. They refiled on June 9, 2022, less than a year after the original submission. They met the same opposition, [the Planning Commission] denied 6-0. They withdrew it and came back again in March of 2023 and filed a third application that was denied. They filed a lawsuit but when the County filed a motion to dismiss because they had sued the wrong parties, they dismissed and came back a fourth time to the Planning Commission, which has again been denied by the Planning Commission. So, it’s been four times before the Planning Commission and twice before you. Why are we back? They said they will keep coming back because that’s what this property was meant to be and we’re going to keep pushing that. But they’re back because they bought a property that was not zoned for what they intended to use it for. It was not on the Future Land Use Map either. In fact, the Future Land Use Map was re-adopted to what we have now, not permitting this use, in 2023, right in the middle of this. They knew it was a snake when they picked it up. In fact, there were speakers that talked about the lengths they went to to get this property, even getting a straw purchaser and telling those purchasers that it was not going to be a mine.
Their behavior has been sort of a bullying type behavior. They have enough money and can hire enough experts. They can keep coming back again and again until the opponents have spent all their money, paying lawyers like me. They can buy experts that they [the opponents] can’t afford to buy…until they run out of energy for trying to protect the property that they had a promise from the County in the form of the Future Land Use Map and Zoning that is in place, that somebody was not going to be able to come in there and put another quarry in there. It’s sort of a corporate bullying behavior. So, what they’ve come back with today is that I was going to say it’s insanity. My definition of insanity is when
you keep coming back again and again and expect a different result. Every one of these applications is basically the same thing again and again. They got up here today and said they’ve made these concessions. But these are not concession that anybody in this room asked for. In fact, what they’re doing is litigation mitigation. They want to come into your house and take all these pictures and that way if they get a suit for nuisance, they’ll already have some evidence to defeat the claim. They’ll put down a $1 million bond. If this was such a great idea, why didn’t they get one in 2021 or 2022 or 2023.
They want to nibble away any opposition that’s out there. They’ve got these experts to come in. I’ve been amused at the expert strategy. Mr. Black said he has 27 years of experience in hydrology. I’ve got 38 years experience in courtrooms, and I can hire experts to go into a courtroom to say anything that I need them to say. These experts are not subject to cross examination. These experts were unheard of until they came back for the fourth time. They’re promising that if your well crashes or your groundwater is contaminated, they’ll be out there and put another well in. If there’s a problem with the well or the groundwater, you can’t go out there a drop another well six feet away from the well that just went bad and say okay you can go get however much water you need every day to water your chickens from that. It doesn’t work that way. If there’s a problem with the groundwater, it’s going to affect lots of wells. We’ve submitted the same letter every time where we’ve laid out the reasons for a rezoning and stated why they do not meet that criteria. They’re back again today because they’ve failed five times before and because they don’t meet the criteria. They’re trying to run rough shod over these people who don’t have the money to put into it. They say all these folks in red are well intentioned.
They are motivated by their life and their future today. The mining company is motivated by pure greed. The fear that the ones that have enough money and enough time can come back and change the rules and have a different set of rules that apply to them than everyone else in this room is the reason that people have a deep distrust of government today. There was a text amendment to your zoning ordinance today and one of the things that it does is extend the time you have to wait before you can apply for rezoning. That text amendment is largely necessitated by what they have done in this case.
This matter is important to the group I represent, not as a passing matter but how they live their lives today.” Speaker No. 8: Renae Carlton, 1846 Hwy. 140, Adairsville “My family and I own the 733-acre tract next to the 750-acre tract they own. I have done research on groundwater. Groundwater wasn’t affected by Vulcan. We have cattle, their drinking water is the spring which creates a creek which flows down to the other farms. If that spring gets disrupted, then how do we feed our cattle? Sixty head of cattle will drink about 1800 gallons a day. They’re willing to replace our well if our well goes dry, but what if the spring dries up? You can’t fix that. These studies that they’ve done, have they been on double quarries? They keep saying it’s rare to have double quarries. I have tried to research on two quarries next to each other and can’t find anything. Dust can travel up to five miles. All the information they’ve given us is for one quarry, not two. So it doubles everything. I am a realtor and this is going to decrease property values.” Speaker No. 9: Brady Hammonds, 116 Public Square, Adairsville speaking for the City of Adairsville. “We are asking for consistency’s sake to follow the Planning Commission’s recommendation for denial. There is the Vulcan property to the west of this property, but the adjoining properties are agriculture.” Speaker No. 10: Alex Payne, 288 Road # 2 South, Cartersville speaking on behalf of his mother and the property he recently purchased at 77 Greene Loop Road, Adairsville.
“There’s been a lot of comments about water, and we do have water that runs through our property that is spring fed. What about contaminants from dust. There’s also the issue of monopoly. I’ve done some research and found seven different companies that operate quarries in the State. There’s not a monopoly. There’s plenty of aggregate being produced in the State of Georgia. I understand that we have people that work in this business and that is their livelihood, but we have poultry farms and cattle farms and this is our livelihood. There may be people that look at our community and look at the Future Land Use Map and say Adairsville is a nice place to go. A gentleman here just purchased the property directly across from this property. Do you think he would have bought this property knowing that a quarry was there? No. The property that I just purchased was originally 150 acres, and has been
in my family going back 150 years. My son is going to have that property in 50 years. His family is going to be on that property. The Lewis family that has the event venue, their kids will have that property when they’re dead and gone. So we’re thinking about our community. Vulcan was there way before a lot of people that are in this room. We can’t change that. But to have another one less than two miles down the road, that’s going to provide 13-14 jobs. I’ve been a machinist for 35 years and have been around equipment and worked at Georgia Power and Atlantic Steel. Noise is a pollution. I understand blasting is one thing, but when you have mills that are running at a decibel of 105-115, you can only be around that for 15 minutes without having hearing loss. Eighty-five decibels, you can be around for about eight hours, but that’s still very loud. Each one of those machines are going to be that loud, 100-115 decibels. I don’t know how many of those mills they will have or where they are, but if you have 4, 5 or 6, that’s noise pollution. There’s dust from the mills. There’s also traffic concerns. My mother lives 3/10 of a mile from that. The property is in a valley, so noise pollution is a concern. When they’re running 8-10 hours a day, there’s going to be people right on their doorstep. Vulcan has a huge buffer, plus there’s an interstate to the west of it.” Speaker No. 11: Terry Seek, 1618 Hwy. 140, Adairsville. “There are kids that play in that area. They keep acting like this is far away from everybody with a whole bunch of buffers, but this is literally in my front yard. Those trucks will be going up and down that road every day while my wife and I are at home working, and right across from where my neighbor’s kids play. That’s a neighborhood.” Speaker No. 12: Al Willis, 1609 Hwy. 140 NW, Adairsville, “the end of their driveway is directly across from my property line so saying that big trucks won’t affect the drive through there is wrong. Also, you said most of the water that is in the rock quarry out there already is from precipitation. I live about a mile from it and it hasn’t rained a whole lot to fill that thing up. We’ve had six speakers up here to speak in favor of this, but five of them don’t live anywhere near this. They say the rock would cheaper, but how soon would that be. Will you accept responsibility for damage to the homes after a blast, not just the wells. If a well goes dry, you said you would have water on standby for immediate replacement until another well can be dug or county water can be installed. Do you happen to know how much water a chicken drinks per day? I’ve been told that it’s a pint. That’s a whole lot of water buffalos on standby. And they say the well drillers are several months out before they can get out to drill a well. If you crack a glass container, the water is going to go somewhere and in a hurry. It will follow the path of least resistance. Are those heavy dump trucks allowed on County roads?” Speaker No. 13: Mark Brown, 54 Brown Farm Road, Cartersville (Rebuttal on behalf of the applicant) “TPM is a boutique consulting firm working directly with property owners and has worked directly with Ken Morrow and Matt Reid for the last eight years. Ken and the other partners are like minded individuals connected by their faith and high moral standards. Georgia Stone didn’t ask me to come up here and speak. But I can no longer sit back and watch these people be disparaged, especially Ken Morrow. For three years now the Mealors and others have traded lies about Ken and the purchase of thirteen acres from the Mealors by Matt Reid Capital five years ago. This lie has been publicly disputed by the closing attorney, Harry White. Ken has been a well-respected businessman in this community for many years, as is his son. People who know Ken know that he would not lie. The Mealors were paid a significant premium for their land and in an effort to save face with their neighbors, conjured up a terrible story about a very good man that has done so much for this county, something I can no longer sit back and allow to stand without publicly addressing it.” Speaker No. 14: Lester Tate, (Rebuttal on behalf of those against the application.) “The factors that the Planning and Zoning folks look at are: 1) existing land uses and classifications of nearby property. There is a quarry to one side, but it is surrounded on three sides by property that is zoned A-1 agricultural. It consists of a vast countryside of rolling hills, residential, churches and a wedding venue; 2) The suitability of the property for the zoned purpose. The property can easily be developed as it is zoned now into a residential development; 3) The extent to which property values are diminished by the particular zoning restrictions. The zoning restrictions protect the property values. Having a quarry come in there will not increase anybody’s property values; 4) A relative gain to the public as compared to the
hardship imposed upon the individual property owner. There is very little gain. The hardship imposed to individual property owners with 364 additional truck trips on the road, dust, air quality, water quality all impact the public safety; 5) Whether the property has a reasonable economic use as currently zoned.
To not approve this rezoning does not deprive them of use of their property, it deprives them of using the property for what they want to use it for; 6) The length of time the property has been vacant as zoned. The property has only been vacant because they have attempted to apply again and again in an attempt to overrun the opposition for a quarry; 7) Whether the zoning is suitable in view of the adjacent property. We’ve already answered that; 8) Whether the proposed zoning will adversely affect the existing use of adjoining property owners. The noise from a quarry will certainly impact my main client who runs a wedding venue there; 9) Whether the zoning is in conformity with the policies and intent of the Land Use Plan. This is the most important. Never has expansion of quarries been in the Bartow County Land Use Plan. Even in the midst of them attempting to rezone this, we’ve re-adopted the Land Use Plan that shows this not being mining land. If that’s a representation of anything to these people it’s that there won’t be an expansion of the quarry like there was under the previous administration; 10) Whether the zoning proposal will cause an excessive or burdensome use of facilities, utilities, or schools. They begin by telling you that there will be 364 trucks entering and exiting the development each day so it certainly has a negative effect on that. When we go through all the public opinions, there’s one thing that’s not in dispute, and that is that all of these factors are in the Bartow County Zoning Ordinance and the Future Land Use Map says say no to this. You [Commissioner] have a fidelity to the law. I think they have tried before, but these people have looked at the factors and applied the law and time and time again, found that the request they made falls short. No concessions have been made. What they’ve done is put a little more lipstick on the pig. We ask you to deny this today.”
Commissioner Taylor stated that “the Planning Commission is a cross section of the County, not just the northwestern part of the County. It’s made up of seven members that I trust. There’s everything from a businessman, a nurse, a retired person, a minister, it's a good cross section of the Bartow County community. I know they take this to heart. That’s why I agree with the Planning Commission. This application is denied.”
There was no further business to address. The meeting adjourned at 11:56 a.m.
On File Kathy Gill, County Clerk
APPROVED:
On File Steve Taylor, Sole Commissioner 12/4/2024 Date