--- title: Berrien County Code of Ordinances, Sec. 10-1. Installation of high voltage electrical transmission lines collection: local-codes id: local-code:berrien-county/code/10-1 cite_as: Berrien County, Ga., Code of Ordinances § 10-1 canonical_url: https://georgiacommons.org/counties/berrien/code/10-1 md_url: https://georgiacommons.org/counties/berrien/code/10-1.md text_url: https://georgiacommons.org/counties/berrien/code/10-1/text source_url: https://library.municode.com/ga/berrien_county/codes/code_of_ordinances date: 2010-11-09 status: active jurisdiction: county:berrien jurisdiction_name: Berrien County county_fips: "13019" corpus_version: local-codes-berrien-county-823dd4d9b584 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/berrien/code/~part-code-of-ordinances/~chapter-10/~article-i.md previous: https://georgiacommons.org/counties/berrien/code/6-83.md next: https://georgiacommons.org/counties/berrien/code/10-2-to-10-30.md index: https://georgiacommons.org/counties/berrien.md branch: code edition: As published by Municode, current through 2010-11-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:berrien-county/code/10-1@2010-11-09-bf6c115316 --- # Berrien County Code of Ordinances, Sec. 10-1. Installation of high voltage electrical transmission lines > As published by Municode, current through 2010-11-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article I - IN GENERAL (a) Purpose. The purpose of this section is to prevent the construction and installation of high voltage electrical transmission lines within Berrien County by any person or entity without first conducting a health risk analysis and an environmental impact study. (b) Threshold requirement for risk analysis. No construction permit shall be issued and no construction shall be initiated for installation of electrical transmission lines in Berrien County, Georgia which will carry voltages of 110 KV or greater prior to providing the Berrien County Board of Commissioners with a comprehensive risk analysis conducted by individuals competent and qualified to perform such studies who are independent of the contractor and power or transmission companies involved in the proposed project. Such study shall provide conclusions as to the health risks to Berrien County citizens living within one-half mile of the proposed path of such transmission lines as well as the health risks to individuals working, attending schools, training facilities or confined to institutions located within one-half mile of the proposed path of such transmission lines. (c) Threshold requirement for environmental impact study. No construction shall be initiated for installation of electrical transmission lines in Berrien County, Georgia, which lines shall require 50 feet of greater right-of-way width on which to construct support towers for such lines, prior to providing a comprehensive environmental impact study to the Berrien County Board of Commissioners conducted by individuals competent and qualified to perform such studies, who are independent of the contractor and power company or transmission company involved in the proposed project. Such study shall provide conclusions as to impact the electrical transmission line installation will have on the environment of Berrien County including but not limited to wildlife, water shed, vegetation and air quality. ## History (Ord. No. 021406, §§ 1—3, 2-14-2006)