Sec. 26-83. Building standards for streams without established base flood elevations or floodways (A zones).

About this text

  • As published by Municode, current through 2010-11-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Within the areas of special flood hazard established in section 26-36, where streams exist but no base flood data has been provided (A zones), or where base flood data has been provided but a floodway has not been delineated, the following provisions apply:

(1) When base flood elevation data or floodway data has not been provided in accordance with section 26-36, then the county building inspector shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of this division. Only if data is not available from these sources, then the subsections (2) and (3) of this section shall apply.

(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 20 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in any increase in flood levels during the occurrence of the base flood discharge.

(3) In flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. Openings sufficient to facilitate the unimpeded movements of floodwater shall be provided in accordance with standards of section 26-81(4), pertaining to elevated buildings.

(4) The building inspector shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.

History

The history line the source prints at the end of the section.

(Ord. of 6-25-2001, art. 4, § C)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:berrien-county/code/26-83@2010-11-09-ac6a44b024

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.