Berrien County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 54 - SUBDIVISIONS / Article III - MINIMUM DESIGN STANDARDS / Division 2 - STREETS
Sec. 54-124. Right-of-way and pavement width.
About this text
- As published by Municode, current through 2010-11-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Street rights-of-way shall be measured between lot lines and shall be prescribed in this section. The pavement width shall be as prescribed below:
Street Classification Minimum Right-of-Way (feet) Minimum Pavement Width (feet) Arterial 100 24 Collector 80 24 Local street 60* 24 Easements ** **
* When new development is proposed with curb and gutter sections, said development may be developed with 20-foot minimum pavement width with curb and gutter and proper storm drainage within a 50-foot right-of-way. When proposed without curb and gutter, a minimum 20-foot minimum pavement width with properly designed swale ditch drainage may be developed within a 60-foot right-of-way. Subdivisions planned for annexation shall be developed to current city standards and shall be subject to review of the city engineer.
** As appropriate for the proposed development, with approval required by the county engineer.
History
(Ord. of 9-24-2001, § 5-6.13; Ord. No. 121405-02, § 1(5-6.13), 12-14-2005)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.