--- title: Berrien County Code of Ordinances, Sec. 54-52. Preliminary plat collection: local-codes id: local-code:berrien-county/code/54-52 cite_as: Berrien County, Ga., Code of Ordinances § 54-52 canonical_url: https://georgiacommons.org/counties/berrien/code/54-52 md_url: https://georgiacommons.org/counties/berrien/code/54-52.md text_url: https://georgiacommons.org/counties/berrien/code/54-52/text source_url: https://library.municode.com/ga/berrien_county/codes/code_of_ordinances date: 2010-11-09 status: active jurisdiction: county:berrien jurisdiction_name: Berrien County county_fips: "13019" corpus_version: local-codes-berrien-county-823dd4d9b584 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/berrien/code/~part-code-of-ordinances/~chapter-54/~article-ii/~division-2.md previous: https://georgiacommons.org/counties/berrien/code/54-51.md next: https://georgiacommons.org/counties/berrien/code/54-53.md index: https://georgiacommons.org/counties/berrien.md branch: code edition: As published by Municode, current through 2010-11-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:berrien-county/code/54-52@2010-11-09-9ee479f0c9 --- # Berrien County Code of Ordinances, Sec. 54-52. Preliminary plat > As published by Municode, current through 2010-11-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 54 - SUBDIVISIONS / Article II - REVIEW AND APPROVAL / Division 2 - APPROVAL STAGES (a) Purpose. The purpose of the preliminary plat is to safeguard the subdivider from unnecessary loss of time and expense in preparation of a subdivision plat which does not conform with the specifications of this chapter. The preliminary plat requires only approximate accuracy of scale and dimension. Public agencies having jurisdiction will review preliminary plats regarding matters within their jurisdiction. During the review process, the subdivider or his agent may be called upon for consultation. (b) Subdivisions not requiring new streets or water or sewer facilities. All subdivisions which do not involve the construction or opening of new streets or water or sewer facilities may be accepted by the county administrator in the form of a final plat, provided that essential data required by the reviewing agencies to ensure compliance with the intent of this chapter is submitted. The final plat shall be reviewed by the staff development review committee and planning commission before submittal to the board of commissioners. (c) Filing. Any person desiring to subdivide land shall file with the county administrator five copies of the preliminary plat accompanied by a letter of application. The letter of application will describe the proposed subdivision at length and will also state for what purposes easements may be utilized, such as water, streets, power or phone maintenance. There will not be any restrictions on the use of easements. The letter of application shall contain the name and address of the developer and his agents, the zoning of the property to be subdivided, whether or not the subdivision will be developed in phases, plans for potential annexation, and plans for serving the proposed subdivision with sewer and water facilities. The plat shall be prepared in accordance with this chapter and with applicable county specifications by a registered land surveyor who is licensed under the laws of the state. The preliminary plat shall be deemed filed with the planning commission when it is filed with the county administrator. At the time of filing, a certificate of filing shall be provided to the subdivider and shall include the time and date of filing. The county administrator, working in conjunction with the subdivision development review committee, shall have authority to reject the preliminary plat if they find it does not comply with this chapter. If rejected, the county administrator and the subdivision development review committee shall provide the subdivider with a written statement specifying all the respects in which the plat fails to comply. Filing of the preliminary plat shall be accomplished at least 20 days prior to the regular planning commission meeting at which it is to be considered. The preliminary plat shall include: (1) Title block and north arrow. The plat will show the name of the proposed subdivision, its location, the name, address and registration number of the surveyor preparing the plat and the date of the plat. A north arrow shall be included with a notation referencing the bearing to magnetic north, astronomical north or grid north. (2) General layout. The plat shall show information as to the proposed street layout and widths, layout of lots with a notation as to the minimum size and width of lots, and any proposed open space. Any lands to be dedicated will be clearly identified. Plat scale, total acreage of the site and total number of lots created shall also be indicated. Lot and block identification and building setback lines shall also be indicated. (3) Topography. The plat shall show existing contour lines dashed and any proposed contour lines solid, with both sets of lines to be at two-foot intervals, mean sea level (MSL). Prominent drainage features such as lakes, depressions, streams, etc., which could affect the design of the subdivision shall be shown. Engineering data showing the high-water elevation and how it was established shall be submitted with the plat. (4) Existing features. The plat shall show the locations and names of existing and platted property lines, streets and their right-of-way, railroads and their right-of-way, public and private rights-of-way, sanitary sewers and size, water mains and size, bridges, culverts, storm drainage and size, easements, parks and other public open spaces, land lot and land district lines, and names of adjoining property owners or subdivisions. Groups of trees and swamp areas shall also be indicated. (5) Location map. The plat shall include a small scale map of sufficient clarity so that the location of the proposed subdivision can be readily determined. (6) Water and sewer facilities. A statement from the subdivider shall be submitted with the preliminary plat which will describe the method by which sanitary sewer and water facilities will be provided. If nonpublic sewer is proposed to serve a subdivision, then soils will be identified according to local detailed soil survey maps and soil percolation test results and a contour map shall accompany the preliminary plat at the time of submission. The contour map shall show the location and identification of each soil class and site of each percolation test. Percolation tests shall be made in accordance with county health department requirements. (7) Future tract plan. In cases where a subdivision is to be developed in stages with additional plats being filed with the planning commission at a later date, the filing of the initial plat will be accompanied by a future tract plan, a reasonably accurate plat in sketch form of the entire tract which will show the future street system and topography for the entire tract. Once the required tract plan has been given approval by the planning commission, five copies of the approved future tract plan must be provided for distribution to the various reviewing agencies. (d) Completeness. If any of the information required by subsection (c) of this section is omitted or misrepresented on the plat, the county administrator may refuse to review the plat and shall return the plat to the subdivider to be completed or revised. (e) Approval by individual agencies. No preliminary plat shall be approved by the planning commission unless it is approved by the county engineer, the road superintendent, and the board of health. Such agencies shall, with or without modification, approve or disapprove the preliminary plat to the extent that each has jurisdiction. If the plat is rejected, the respective reviewing agency shall provide the planning commission with a written statement specifying all aspects where the plat fails to comply. (f) Review and recommendation by staff development review committee. Upon receipt of the filing of the preliminary plat, the county administrator shall prepare those materials for presentation to the staff development review committee. The staff development review committee shall review the preliminary plat for technical compliance with this chapter, the comprehensive plan, and other county ordinances that might impact on the proposed land subdivision. The staff development review committee shall recommend in writing approval, conditional approval, postponement or disapproval within 45 working days of submission. (g) Coordination. It shall be the responsibility of the county administrator to ensure that the review of the staff development review committee is brought together in a timely fashion for proper presentation to the planning commission. (h) Review by planning commission. Final review of the proposed preliminary subdivision plat shall be made by the planning commission at its next regular meeting. The county administrator shall be responsible for coordination of information to be brought before the planning commission, which at a minimum shall include the recommendations of the staff development review committee (county engineer, road superintendent, and board of health). The planning commission may grant preliminary approval, conditional approval, postponement or disapproval within 30 days of submission. (1) Preliminary approval. Preliminary approval by the planning commission means that the developer is now authorized to proceed with the preparation of the required improvement plans, outlined in detail under section 54-53. No developer shall proceed with any construction or any other work in the proposed subdivision before obtaining preliminary approval of these improvement plans in writing. Lots shall not be sold nor shall building construction begin at this time. Preliminary approval grants the developer a minimum time of 18 months within which he shall submit his improvements plan and final plat for approval unless a time extension is granted by the planning commission before the expiration of the 18-month period. If, in the opinion of the staff development review committee, substantial changes have been made to the approved preliminary plat, the revised plat shall be resubmitted as a new preliminary plat. (2) Conditional approval. Conditional approval by the planning commission means the developer may proceed after written notice from the zoning administrator, as outlined under subsection (h)(1) of this section, but only after he has submitted at least five copies of the corrected preliminary plat to the county administrator, noting thereon the conditions or changes required by the approval of the planning commission. (3) Postponement. Postponement by the planning commission means action is delayed for specific reasons which shall be noted and transmitted in writing to the developer by the administrator. Postponed preliminary plats may be reconsidered by the planning commission without resubmittal to the staff development review committee. (4) Disapproval. Disapproval by the planning commission means denial of the application for the subdivision because the developer's plans are not in compliance with this chapter. For further consideration, the developer must rework and resubmit his plans as though they were a completely new preliminary plat. The specific reasons for disapproval shall be stated to allow for correction. ## History (Ord. of 9-24-2001, § 4-1)