--- title: Berrien County Code of Ordinances, Sec. 54-82. Easements collection: local-codes id: local-code:berrien-county/code/54-82 cite_as: Berrien County, Ga., Code of Ordinances § 54-82 canonical_url: https://georgiacommons.org/counties/berrien/code/54-82 md_url: https://georgiacommons.org/counties/berrien/code/54-82.md text_url: https://georgiacommons.org/counties/berrien/code/54-82/text source_url: https://library.municode.com/ga/berrien_county/codes/code_of_ordinances date: 2010-11-09 status: active jurisdiction: county:berrien jurisdiction_name: Berrien County county_fips: "13019" corpus_version: local-codes-berrien-county-823dd4d9b584 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/berrien/code/~part-code-of-ordinances/~chapter-54/~article-iii/~division-1.md previous: https://georgiacommons.org/counties/berrien/code/54-81.md next: https://georgiacommons.org/counties/berrien/code/54-83.md index: https://georgiacommons.org/counties/berrien.md branch: code edition: As published by Municode, current through 2010-11-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:berrien-county/code/54-82@2010-11-09-83a4956642 --- # Berrien County Code of Ordinances, Sec. 54-82. Easements > As published by Municode, current through 2010-11-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 54 - SUBDIVISIONS / Article III - MINIMUM DESIGN STANDARDS / Division 1 - GENERALLY (a) Utility easements. Utility easements for overhead services shall be located within the platted street right-of-way and shall be a minimum width of 20 feet. Where possible, as determined by the county engineer, water lines shall be located on the west and south sides of streets and sewer and gas lines shall be on the east and north sides. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within the subdivision or phase thereof. All public utilities within the subdivision shall be located on public rights-of-way. (b) Drainage easements. Drainage easements shall be provided as required by the county engineer after review of the preliminary improvement plans and preliminary plat of the subject subdivision. ## History (Ord. of 9-24-2001, § 5-2)