(a) Utility easements. Utility easements for overhead services shall be located within the platted street right-of-way and shall be a minimum width of 20 feet. Where possible, as determined by the county engineer, water lines shall be located on the west and south sides of streets and sewer and gas lines shall be on the east and north sides. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within the subdivision or phase thereof. All public utilities within the subdivision shall be located on public rights-of-way. (b) Drainage easements. Drainage easements shall be provided as required by the county engineer after review of the preliminary improvement plans and preliminary plat of the subject subdivision.