Skip to content
Georgia Commons
Menu

Berrien County · Code of Ordinances

Part - CODE OF ORDINANCES / Appendix A - FEES

Appendix A. FEES

About this text

  • As published by Municode, current through 2010-11-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Total Valuation Fees $50,000.00 to $100,000.00 $260.00 for the first $50,000.00 plus $4.00 for each additional $1,000.00 or

fraction thereof, to and including $500,000.00.

$100,000.00 to $500,000.00 $460.00 for the first $100,000.00 plus $3.00 for each additional $1,000.00 or

fraction thereof, to and including $500,000.00 $500,000.00 and up $1,660.00 for the first $500,000.00 plus $2.00 for each additional $1,000.00 or fraction thereof

b. Moving fee. For the moving of any building or structure, except a manufactured home, the fee shall be $100.00. The fee for moving of a manufactured home and the set-up with foundation and anchors shall be $65.00 plus the required electrical fee.

(2) Plan-checking review fees. When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted by section 104.2 of the Standard Building Code, a plan-checking review fee shall be paid to the building official at the time of submitting plans and specifications for checking. The plan-checking review fee shall be equal to one-fourth of the building permit fee as set forth in section 103.7.4 of the Standard Building Code. Such plan-checking fee is in addition to the building permit fee.

(3) Re-inspection fee. For all fees, including building, electrical, plumbing, and mechanical, there shall be a re-inspection fee of $25.00. The re-inspection fee shall not be charged until the third re-inspection of the same work is required. The first two inspections of the same work shall be done without cost. Upon the re-inspection for the third time, a fee of $25.00 shall be paid.

(4) Electrical permit fees.

New (Residential and Commercial) Work or Items Existing Services Without Upgrading, Remodeling, Repairs, Additions, Residential and Commercial 0—100 amps $ 50.00 $ 20.00 Over 100—200 amps 80.00 30.00 Over 200—400 amps 100.00 50.00 Over 400—600 amps 150.00 60.00 Over 600—1,000 amps 200.00 80.00 Over 1,000—2,000 amps 300.00 100.00 New (Residential and Commercial) Work or Items Existing Services Without Upgrading, Remodeling, Repairs, Additions, Residential and Commercial Over 2,000 and up 400.00 150.00 Swimming pool $20.00 M/H Based on amp service

(5) Plumbing permit fees.

New residential and commercial work or items: $10.00 per fixture.

(6) Mechanical permit fees.

a. Air conditioners:

b. Heating—electrical:

c. Heating—gas:

§ 18-63. 911 service charge: $1.50 per month per exchange access facility.

§ 38-54. Excess attendance assessment: For each person in attendance beyond Such payment may be prorated at $9.00 per month or fraction of a month for the remainder of the year in which the license is first approved.

(Res. No. 93-003, 1-19-1993; Res. of 5-24-1993, §§ 6, 9; Ord. of 11-8-1993, § VI(C); Ord. of 2-9-1998, § 3; Ord. of 11-22-1999; Ord. of 3-12-2001, § VII(A)—(G); Ord. of 9-24-2001, § V(B)(3);

Res. of 3-14-2002; Ord. of 2-10-2003, § 1(XV))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:berrien-county/code/part-appendix-a-appendix-a@2010-11-09-fc826944b0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.