Bleckley County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 30 - ENVIRONMENT / Article II - SOIL EROSION AND SEDIMENTATION CONTROL
Sec. 30-23. Permit process; application.
About this text
- As published by Municode, current through 2023-08-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Generally. The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the local issuing authority that affect the tract to be developed and the area surrounding it. They shall review the zoning regulations, stormwater management regulations, subdivision regulations, flood damage prevention regulations, this article, and other regulations which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the operator is the only party who may obtain a permit.
(b) Application requirements.
(1) No person shall conduct any land disturbing activity within the jurisdictional boundaries of the county without first obtaining a permit from the code enforcement officer to perform such activity.
(2) The application for a permit shall be submitted to the code enforcement officer and must include the applicant's erosion and sedimentation control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in subsection (c) of this section. Soil erosion and sedimentation control plans shall conform to the provisions of section 30-22(b) and (c). Applications for a permit will not be accepted unless accompanied by three copies of the applicant's soil erosion and sedimentation control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan or that such a visit was not required in accordance with rules and regulations established by the board.
(3) A fee in the amount of $80.00 shall be charged for each acre or fraction thereof in the project area.
(4) In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A.
§ 12-5-23(a)(5), provided that such fees shall not exceed $80.00 per acre of land disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
(5) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan.
A district shall approve or disapprove a plan within 35 days of receipt. Failure of a district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by section 30-22(c)(15) and (16) and bonding, if required as per subsection (b)(7) of this section, have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district.
(6) If a permit applicant has had two or more violations of previous permits, this section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing of the application under consideration, the local issuing authority may deny the permit application.
(7) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land disturbing activity, prior to issuing the permit. If the applicant does not comply with this article or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance.
(c) Plan requirements.
(1) Plans must be prepared to meet the minimum requirements as contained in section 30-22(b) and (c). Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the state soil and water conservation commission, as a guide; or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local articles and state laws.
(2) Data required for site plan:
a. Narrative or notes, and other information: Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes.
b. Description of existing land use at project site and description of proposed project.
c. Name, address, and phone number of the property owner.
d. Name and phone number of 24-hour local contact who is responsible for erosion and sedimentation controls.
e. Size of project, or phase under construction, in acres.
f. Activity schedule showing anticipated starting and completion dates for the project. Include the statement in bold letters that "The installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land disturbing activities."
g. Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas.
h. Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan should show options for yearround seeding.
i. Detail drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.
j. A maintenance statement as follows: "Erosion and sedimentation control measures will be maintained at all times. If full implementation of the approved plan does not provide for effective erosion and sediment control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."
(3) Maps, drawings, and supportive computations shall bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion and sedimentation control. All persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land disturbing activity shall meet the education and training certification requirements as developed by the commission pursuant to O.C.G.A. § 12-7-20. The certified plans shall contain:
a. Graphic scale and north point or arrow indicating magnetic north.
b. Vicinity maps showing location of project and existing streets.
c. Boundary line survey.
d. Delineation of disturbed areas within project boundary.
e. Existing and planned contours, with an interval in accordance with the following:
Map Scale Ground Slope Contour Interval (in feet) 1 inch = 100 feet or larger scale Flat 0-2% 0.5 or 1 Rolling 2-8% 1 or 2 Map Scale Ground Slope Contour Interval (in feet) Steep 8% + 2, 5 or 10
f. Adjacent areas and feature areas such as streams, lakes, residential areas, etc., which might be affected should be indicated on the plan.
g. Proposed structures or additions to existing structures and paved areas.
h. Delineate the 25-foot horizontal buffer adjacent to state waters and the specified width in MRPA areas.
i. Delineate the specified horizontal buffer along designated trout streams, where applicable.
j. Location of erosion and sedimentation control measures and practices using coding symbols from chapter 6 of the Manual for Erosion and Sediment Control in Georgia.
(4) Maintenance of all soil erosion and sedimentation control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner.
(d) Permits.
(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary.
(2) No permit shall be issued by the local issuing authority unless the erosion and sedimentation control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by section 30-22(c)(15) and (16) are obtained, bonding requirements, if necessary, as per subsection (b)(7) of this section are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(3) If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(4) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
History
(Ord. of 4-18-1996; Res. of 8-15-1996, § 2.1; Ord. of 2-6-2007(1))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.