(a) Septic tanks permitted. No septic tank shall be installed where a public sewer is accessible to the premises involved, nor in any place where the health inspector deems the use of a septic tank to be a menace to human health or a nuisance to the general welfare of the county. (b) On-site sewage management permit required. Prior to the construction of any house or building, or alteration or addition thereto, and prior to the location or relocation of any mobile home in the county from which sewage must be disposed of by means of a septic tank or alternative system, an on-site sewage management permit must be obtained from the county health department, in addition to any other required building or relocation permits. (c) Subdivisions. Where private systems for the disposal of sewage and other liquid wastes are proposed in any planned subdivision, before any person may develop the subdivision and before the sale of any lots therein or the erection of any buildings thereon, the owner or his designee shall file such plats, plans, and specifications as the health inspector may deem necessary to evaluate the permissibility of the planned subdivision sewage systems. Upon approval, the health inspector shall issue a permit as set forth in this article. (d) Permit coordination. The permit shall not be issued, and no construction, erection, move, or other activity regulated by this article may proceed, until the county health department issues an on-site sewage management construction permit or a site approval letter, whichever is appropriate, so that all lots proposed to be used or subdivided would satisfy the requirements of this article, including the rules of the state department of human resources for on-site sewage management systems. (e) Form and contents of application. The application for the permit shall be made on the form prescribed by the health department and shall include, at a minimum, the following information: (1) The name and address of the applicant; (2) The address of the location of the building or mobile home for which the permit is sought; (3) For residential structures, the number of bedrooms contained or to be contained therein; and (4) For commercial or industrial structures, the amount of the anticipated water usage. (f) Duties of health department. It is the duty of the county health department to evaluate the proposed structure and to issue the on-site sewage management permit for those sites that comply with the rules and regulations promulgated by the county health department for on-site sewage management systems. (g) Duties of applicant. It shall be the duty of the property owner or building contractor, or the applicant, if different from the property owner or building contractor, to request evaluation by the health department, prior to beginning construction or prior to locating or relocating a mobile home, for purposes of determining if the septic tank system complies with the rules and regulations promulgated by the county health department for on-site sewage management systems. (h) Minimum lot size. All lots intended for residential or other use within the county shall be of such size as is specified by the county health department according to the Rules of Georgia Department of Human Resources Public Health for On-Site Sewage Management Systems Manual for On-Site Sewage Management and/or this article, whichever is more stringent; provided, however, that if the lot includes or will include a septic tank, it shall be: (1) Not less than 1.5 acres if a water well is used on the same lot; or (2) Not less than 0.75 acre if there will be no water well and the lot will use the public water supply system. (i) Requirements are minimum. The regulations and requirements set by this article shall be the minimum requirements. (j) Preexisting uses. The provisions of this article regarding minimum lot size shall not apply to lots that are the subject of a plat recorded prior to the adoption of the ordinance from which this article is derived or a deed conveying ownership to the current owner recorded prior to the adoption of the ordinance from which this article is derived. (k) Compliance with state and federal regulations. All developments, structures, and uses within the county shall also meet the requirements of all other local, federal and state regulations in effect, including but not limited to department of transportation regulations, state fire marshal regulations, the state's uniform construction codes, state department of natural resources, and state environmental protection division environmental rules and regulations. Issuance of a permit under this article does not constitute certification of compliance with such codes or regulations, and does not abrogate responsibility of the owner to so comply. (l) Map interpretation. If there is any uncertainty as to whether a lot, portion of lot, or a proposed construction or location impacts an environmental resource regulated by this article because of interpretation of the applicable map, the decision of the sole commissioner or the county health department shall take precedence and be considered correct and final, but may be appealed as set forth in this article. (m) Appeal. Any person who feels aggrieved by a decision of the sole commissioner or the county health department, as appropriate, regarding map interpretation may at his own expense request reconsideration. Such reconsideration shall include submission of scientific evidence for reversal of the alleged error in map interpretation, and such evidence must be documented by a state registered engineer, geologist, or soils scientist. To obtain a reversal of the decision of map interpretation, the evidence must be acceptable to the state department of natural resources' environmental protection division, and the sole commissioner, and/or the county health department. Any costs for submission of evidence to the state department of natural resources' environmental protection division shall be borne by the person requesting reconsideration. (n) Coordination with zoning and other regulation. The provisions of this article shall be coordinated with any zoning or other regulations adopted by the sole commissioner, and if there is any conflict with those zoning or other regulations, the stricter provisions shall apply. If zoning is or has been adopted, the provisions of this article shall be considered an overlay, or additional requirements to the requirements of underlying zoning regulations and district. (o) Fees. Any fees for applications, inspections, and the issuance of permits or certificates required or issued under the provisions of this article shall be paid by the person seeking such permit at the time of application in advance of the issuance of such permits or certificates. The amount of such fees, if any, shall be those established by the sole commissioner from time to time.