(a) Connection of service utilities. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the technical codes for which a permit is required, until released by the building official and a certificate of occupancy is issued. (b) [Temporary service.] Temporary service will be allowed for the following purposes only: (1) The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems. (2) Temporary electrical power and lighting installations (building saws) shall be permitted during the period of construction, remodeling, maintenance, repair, or demolition of buildings, structures, equipment, or similar activities. (3) Temporary electrical power and lighting installations shall be permitted for a period not to exceed 90 days for holiday decorative lighting, carnivals, and similar purposes. (c) Authority to disconnect service utilities. The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the technical codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building structure or service system shall be notified in writing, as soon as practical thereafter. In the case of temporary services, temporary wiring shall be removed immediately upon completion of construction or purpose for which the wiring was installed. (d) Sanitation provisions. Adequate sanitation will be required for each job site.