It is hereby determined that: (1) The land development process generally alters the hydrologic response of development sites. If not properly designed land development can result in increasing stormwater runoff rates, volumes and pollutant loads, can alter salinity concentrations and potentially increases flooding, channel erosion and pollutant transport and deposition in wetlands, rivers, estuaries and streams; (2) The land development process may increase bacteria transport and deposition in near coastal waters, which leads to beach contamination and poses a serious threat to human health; (3) The land development process may decrease the amount of rainfall that is available to recharge shallow groundwater aquifers; (4) The negative impacts of the land development process can be controlled and minimized through the management of stormwater runoff rates and pollutant loads; (5) Therefore, Brantley County has determined that it is in the public interest to control and minimize the adverse impacts of the land development process and has established this set of local stormwater management regulations to control postconstruction stormwater runoff rate on development and redevelopment sites.