Prior to the preparation and submittal of a stormwater management design plan and permit application, the owner or developer shall submit to Brantley County for review and approval, a stormwater management concept plan illustrating the layout of the proposed development project and showing, in general, how post-construction stormwater runoff will be managed on the development site. Green infrastructure practices (i.e., better site planning techniques, better site design techniques, low impact development practices) are encouraged, but not required, to be used during the creation of a stormwater management concept plan. Green infrastructure practices include, but are not limited to, protecting primary and secondary conservation areas, reducing clearing and grading limits, reducing roadway lengths and widths, reducing parking lot and building footprints, soil restoration, site reforestation/revegetation, vegetated filter strips and rain gardens.