Subsequent to approval of the stormwater management concept plan, the owner or developer shall submit to Brantley County for review and approval, a stormwater management design plan that details how post-development stormwater runoff will be controlled or managed on the development site. The stormwater management design plan shall detail how the proposed development project will meet the post-construction stormwater management and site planning and design criteria that apply to the development site. A copy of the stormwater management concept plan shall be included with the submittal of the stormwater management design plan. The stormwater management design plan should be consistent with the stormwater management concept plan. If any significant changes were made to the plan of development, the county engineer may ask for a written statement providing rationale for any of the changes that were made.