All stormwater management design plans shall include on-site stormwater management practices, unless arrangements are made with the county engineer to manage postconstruction stormwater runoff in an off-site or regional stormwater management practice. The off-site or regional stormwater management practice must be located on property legally dedicated to that purpose, be designed and sized to meet the post-construction stormwater management criteria presented in the Brantley County LDM. In addition, appropriate stormwater management practices shall be installed, where necessary, to protect properties and drainage channels that are located between the development site and the location of the off-site or regional stormwater management practice. To be eligible for compliance through the use of off-site stormwater management practices, the applicant must submit a stormwater management design plan to Brantley County that shows the adequacy of the off-site or regional stormwater management practice and demonstrates, to the satisfaction of the county engineer, that the off-site or regional stormwater management practice will not result in the following impacts: (1) Increased threat of flood damage or endangerment to public health or safety; (2) Deterioration of existing culverts, bridges, dams and other structures; (3) Accelerated streambank or streambed erosion or siltation.