Periodic inspections of the stormwater management practices shown on the approved stormwater management design plan shall be conducted by staff or representatives of the county engineer during construction. Construction inspections shall utilize the approved stormwater management design plan for establishing compliance with the provisions of this article. If any violations are found, the applicant shall be notified in writing about the nature of the violation and the remedial measures that are required to bring the action or inaction into compliance with the approved stormwater management design plan. In the event that the remedial measures described in such notice have not been completed by the date set forth in the notice, any one or more of the enforcement actions outlined in this article may be taken against the applicant.