--- title: Brantley County Code of Ordinances, Sec. 40-143. Final inspection and record drawings collection: local-codes id: local-code:brantley-county/code/40-143 cite_as: Brantley County, Ga., Code of Ordinances § 40-143 canonical_url: https://georgiacommons.org/counties/brantley/code/40-143 md_url: https://georgiacommons.org/counties/brantley/code/40-143.md text_url: https://georgiacommons.org/counties/brantley/code/40-143/text source_url: https://library.municode.com/ga/brantley_county/codes/code_of_ordinances date: 2025-04-03 status: active jurisdiction: county:brantley jurisdiction_name: Brantley County county_fips: "13025" corpus_version: local-codes-brantley-county-ad761106471c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/brantley/code/~part-ii/~chapter-40/~article-iii/~division-3.md previous: https://georgiacommons.org/counties/brantley/code/40-142.md next: https://georgiacommons.org/counties/brantley/code/40-144-to-40-160.md index: https://georgiacommons.org/counties/brantley.md branch: code edition: As published by Municode, current through 2025-04-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:brantley-county/code/40-143@2025-04-03-baf0962d9e --- # Brantley County Code of Ordinances, Sec. 40-143. Final inspection and record drawings > As published by Municode, current through 2025-04-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 40 - ENVIRONMENT / Article III - STORMWATER MANAGEMENT / Division 3 - CONSTRUCTION INSPECTION OF STORMWATER MANAGEMENT SYSTEMS Subsequent to the final installation and stabilization of all infrastructure and stormwater management practices shown on the approved stormwater management design plan, and before the issuance of a certificate of occupancy or final plat, the applicant is responsible for assuring that the project has been completed in accordance with the approved stormwater management design plan and submitting record drawings for all green infrastructure and stormwater management practices shown on the approved stormwater management design plan. The record drawings must show the final design specifications for all green infrastructure and stormwater management practices and must be certified by a licensed design professional such as a landscape architect (green infrastructure only) or professional engineer. A final inspection shall be conducted by the county engineer or his designee to confirm the accuracy of the record drawings. ## History (Ord. of 9-14-2010, § 4.3)