Subsequent to the final installation and stabilization of all infrastructure and stormwater management practices shown on the approved stormwater management design plan, and before the issuance of a certificate of occupancy or final plat, the applicant is responsible for assuring that the project has been completed in accordance with the approved stormwater management design plan and submitting record drawings for all green infrastructure and stormwater management practices shown on the approved stormwater management design plan. The record drawings must show the final design specifications for all green infrastructure and stormwater management practices and must be certified by a licensed design professional such as a landscape architect (green infrastructure only) or professional engineer. A final inspection shall be conducted by the county engineer or his designee to confirm the accuracy of the record drawings.