--- title: Brantley County Code of Ordinances, Sec. 42-32. Permit procedures collection: local-codes id: local-code:brantley-county/code/42-32 cite_as: Brantley County, Ga., Code of Ordinances § 42-32 canonical_url: https://georgiacommons.org/counties/brantley/code/42-32 md_url: https://georgiacommons.org/counties/brantley/code/42-32.md text_url: https://georgiacommons.org/counties/brantley/code/42-32/text source_url: https://library.municode.com/ga/brantley_county/codes/code_of_ordinances date: 2025-04-03 status: active jurisdiction: county:brantley jurisdiction_name: Brantley County county_fips: "13025" corpus_version: local-codes-brantley-county-ad761106471c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/brantley/code/~part-ii/~chapter-42/~article-ii.md previous: https://georgiacommons.org/counties/brantley/code/42-31.md next: https://georgiacommons.org/counties/brantley/code/42-33.md index: https://georgiacommons.org/counties/brantley.md branch: code edition: As published by Municode, current through 2025-04-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:brantley-county/code/42-32@2025-04-03-4d27ae871f --- # Brantley County Code of Ordinances, Sec. 42-32. Permit procedures > As published by Municode, current through 2025-04-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 42 - FLOODS / Article II - ADMINISTRATION Application for a development permit shall be made to the chairman on forms furnished by him prior to any development activities, and may include, but not be limited to, the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities, and the location of such structures, materials, and facilities. Specifically, the following information is required: (1) Application stage. a. Elevation in relation to mean sea level of the proposed lowest floor, including the basement, of all buildings; b. Elevation in relation to mean sea level to which any nonresidential building will be floodproofed; c. Certificate from a registered professional engineer or architect that the nonresidential floodproofed building will meet the floodproofing criteria in subsection 42-62(2); d. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; and (2) Construction stage. Provide a floor elevation or floodproofing certification after the lowest floor is completed, or instances where the building is subject to the regulations applicable to coastal high hazard areas, after placement of the horizontal structural members of the lowest floor. Upon placement of the lowest floor, or floodproofing by whatever construction means, or upon placement of the horizontal structural members of the lowest floor, whichever is applicable, it shall be the duty of the permit holder to submit to the chairman a certification of the elevation of the lowest floor, floodproofed elevation, or the elevation of the lowest portion of the horizontal structural members of the lowest floor, whichever is applicable, as built, in relation to mean sea level. The certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by such land surveyor or professional engineer. When floodproofing is utilized for a particular building, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by such land surveyor or professional engineer. Any work undertaken prior to submission of the certification shall be at the permit holder's risk. The chairman shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make the corrections required shall be cause to issue a stop work order for the project. ## History (Ord. of 9-13-1988, art. 4, § B)