(a) All pre-owned manufactured homes or mobile homes will be inspected by the Brantley County Building Official prior to being occupied as a residence n Brantley County. Mobile homes built prior to June 15, 1976 will have to meet HUD 1974 standards existing prior to the adoption of the Act. In addition, pre-owned manufactured homes shall comply with the following specifications: (1) All wiring (existing and new) shall comply with the National Electrical Code. All wiring, except service entry wiring, shall be copper. (2) The inside panel box must be a minimum of 100 amperes at 120/240 volts according to the National Electrical Code (NEC 550.326). (b) Installer or manufactured home dealer will be permitted to move a manufactured home/mobile home on their lots, or yards for repair. The repair will be completed within three months from the date of the move. This period may be extended for an additional 60 days without cost upon an installer or manufactured home dealer submitting a request for extension to the county manager stating why such an extension is necessary. (c) Pre-owned manufactured homes or mobile homes in Brantley County that change ownership and are not moved to a new location will be inspected on site if the home has not been previously inspected. (d) The building official is authorized to make inspections of manufactured home and mobile home installation to ensure compliance with O.C.G.A. ยง 8-2-160 et seq. and the rules and regulations promulgated thereunder. (e) Installers or manufactured home dealers will have three months from date of approval of these standards to repair any pre-owned manufactured homes or mobile homes located on their lots. (f) Inspection fees for pre-owned manufactured homes located in Brantley County shall be subject to a $60.00 fee. Pre-owned manufactured homes or mobile homes coming into Brantley County from an adjacent county shall pay a $60.00 fee, plus mileage as established by the county commission. All fees shall be collected before any inspections shall be performed. (g) All electrical, plumbing, and mechanical improvements/alterations shall be completed by an appropriate State of Georgia licensed contractor.