Skip to content
Georgia Commons
Menu

Brantley County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 66 - ROADS AND BRIDGES / Article II - ROAD ACCEPTANCE STANDARDS

Sec. 66-38. Drainage plans and requirement for subdivision developments.

About this text

  • As published by Municode, current through 2025-04-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Curbs, inlets, swales, ditches, pipes, etc., shall be engineered and constructed as required to accommodate stormwater run-off quantities. The development engineer shall submit calculations and elevations, which support the proposed improvements to the county road superintendent for his approval. Material requirements for pipe culverts shall be:

(1) Reinforced concrete pipes or high-density polyethylene (HDPE) shall be required for all culverts. The use of HDPE shall require a minimum of one and one-half foot of cover.

(2) No metal culverts shall be allowed.

(3) The minimum diameter for pipe culverts shall be 15 inches.

(4) All material shall conform to the current Georgia Department of Transportation material specifications.

History

The history line the source prints at the end of the section.

(Amend. of 2-23-2006, art. 8)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:brantley-county/code/66-38@2025-04-03-621e54d4e9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Brantley County Code of Ordinances, Sec. 66-38. Drainage plans and requirement for subdivision developments | Georgia Commons