Upon approval of the Preliminary Plat by the Planning Commission, the Subdivider shall proceed with preparation of the Construction Plans to describe, in detail, any physical improvements related to streets, drainage and utilities. If required by Brantley County Ordinance, tree save information shall also be provided at this stage. Then ten (10) copies or lesser number if accepted, of the Construction Plans shall be submitted to the County for review. This submittal shall consist of the Construction Plans and the following supporting documentation. 1. Completed Construction Plan Application. 2. Completed Construction Plan Checklist. 3. If required, an copy of an approved Soil Erosion and Sedimentation Control Plan. 4. If required, an copy of the Stormwater Management Design Plan application. The Stormwater Management Design Plan must be approved by the County Engineer prior to approval of the Construction Plans. 5. A copy of the approved Preliminary Plat. 6. If wells and/or septic systems are proposed, a copy of the application approved by the Brantley County Environmental Health Department. 7. If private utility systems are proposed, a copy of the permit from EPD or approval of the Brantley County Environmental Health Department. 8. If the development includes connections to existing utility systems, approval from the utility provider must be included. 9. Copies of any required regulatory permits including, but not limited to: 404 permits and NPDES Construction permits.