Brooks County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 34 - ROADS AND BRIDGES / Article III - PERMITS, RIGHT-OF-WAY, IMPROVEMENTS, AND OBSTRUCTIONS

Sec. 34-62. Obstructions or improvements in right-of-way.

About this text

  • As published by Municode, current through 2022-11-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following outlines current county policy on existing obstructions or improvements that lie inside the area of additional right-of-way:

(1) Driveways. All active driveways, previously paved or concrete, will be placed to the new right-of-way using the same type asphalt or surface treatment pavement as used on the main roadway. Driveway pavement will be 12 feet wide with ten feet radius or meter at the roadway pavement. Should the property owner prefer a different material or width, it will be at the owner's expense and will require a driveway permit.

(2) Trees, shrubs, and landscaping. Property owners will be notified prior to the beginning of clearing activities. Property owners are responsible for relocating trees, shrubs and other landscape features that are on the new right-of-way.

(3) Income producing trees. Payment for income producing trees will be negotiated on a case-by-case basis. Factors affecting the offer are size, age and the general health of each tree.

(4) Mailboxes. Mailboxes on posts will be moved by the contractor during constructions, and will be installed in their final location by the contractor after construction. Brick and other masonry mailboxes will not be replaced within the right-of-way. Such masonry mailboxes will be replaced with mailboxes on four-inch by four-inch wooden posts.

(5) Decorative headwalls, driveway entrance walls and/or columns. Property owners are responsible for relocating such improvements. Walls, columns, and headwalls not relocated prior to beginning construction will be removed during the clearing process of construction.

(6) Property pins and monuments. During the right-of-way acquisition process, each owner must specifically request compensation of property pins/monuments materials that will be disturbed by construction. The owner is responsible for locating and flagging existing property pins/monuments. Payment for pins or monuments will be negotiated on a case-by-case basis, however surveying expenses generated in relocating property pins/monuments will be paid by the property owner.

(7) Fences. The county will reimburse the property owner for fence that is capable of holding livestock at a rate of $1.90 per linear foot. Reimbursement is not automatic, and each owner must request this reimbursement during right-of-way acquisition process.

(8) Individual utility systems (water and irrigation systems, septic systems). The county will reimburse the property owner for relocating utilities that are in right-of-way to be acquired. Reimbursement is not automatic, and each owner must request this reimbursement during the right-of-way acquisition process. Utilities not relocated in a timely manner and causing delay of construction will be relocated by the county and no reimbursement will be made to the utility owner.

(9) Community utility systems (water and sewer systems). The county will reimburse the utility owner for relocating utilities that are in right-of-way to be acquired. The utility owner will be required to relocate utilities that lie within the existing roadbed or right-of-way at their expense. Utilities not relocated in a timely manner and causing delay of construction will be relocated by the county and no reimbursement will be made to the utility owner.

Please review this information carefully. For the cases listed above as well as for any other existing obstruction, negotiations must be completed during the right-of-way acquisition process. After additional right-of-way is obtained by the county no consideration will be made for removal of improvements or obstructions.

ACKNOWLEDGMENT DATE

Property Owner(s) Signature(s) Attachment (See attached Obstructions Form)

OBSTRUCTION FORM

County Road (Name & Number) R/W Deed # Tax Parcel # R/W Map # R/W Map Date Name (as shown on deed) Correct Mailing Address Telephone Number Day Night There are obstructions (fences, etc.) located on the right-of-way.

List Obstructions Below:

Number and Width of Existing Drains:

Other Comments:

Property Owner Print Name Property Owner Signature Date County Representative Date (Mo. of 12-17-2001)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:brooks-county/code/34-62@2022-11-07-f4f523778c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Brooks County Code of Ordinances, Sec. 34-62. Obstructions or improvements in right-of-way | Georgia Commons