Bulloch County · Code of Ordinances

Appendix B - SUBDIVISION REGULATIONS (APRIL 4, 2023) / Article X - CONSTRUCTION SCHEDULE

Section 10.1. Prior approval.

About this text

  • As published by Municode, current through 2026-02-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

No construction or land disturbing activity of any kind, including grading, installation of improvements, or building shall begin on any land subject to these regulations without prior approval and implementation of the preliminary plat and soil erosion and sedimentation control plan where required by local, state or federal laws or regulations. All subdivisions and planned development projects shall construct and install all improvements in accordance with the requirements of these regulations. The steps for pre-construction review and approval and required inspections shall be followed accordingly.

10.1.1. Procedures. Prior to beginning development of the subdivision the subdivider shall first obtain the following approvals:

(a) Preliminary plat or planned development approval required. The subdivider must first have a preliminary subdivision plat or general development plan approved by the county.

(b) Soil erosion and sedimentation control plan. The subdivider must have a soil erosion and sedimentation control plan in compliance with the Bulloch County Soil Erosion and Sedimentation Control Ordinance. The plan shall be reviewed and coordinated by the building and zoning official.

(c) Preconstruction conference. Prior to grading, the subdivider shall contact the building and zoning official to arrange a preconstruction conference. The preconstruction meeting shall include the results and discussion of departmental reviews of the soil erosion and sedimentation control plan, and the construction improvement plan (including street cross sections and profiles, construction specifications, procedures for inspections and testing, stormwater drainage and detention facilities, water/ sewer facilities, and any other matters concerning the development). The subdivider shall provide a list of names, telephone numbers, addresses, and business license numbers of all contractors and subcontractors employed on a job.

(d) Notice to proceed with construction activities required. A notice to proceed shall be issued by the building and zoning official only after the approval of the preliminary plat, general development plan for a planned development, soil erosion and sedimentation control plan, and if required a stormwater maintenance and drainage plan, traffic study, and the conclusion of a preconstruction conference. Site grading shall be limited only to those areas clearly defined on the approved plans. Any site grading which is done without an approved soil erosion control plan and notice to proceed is a violation of these regulations and shall result in enforcement penalties.

History

The history line the source prints at the end of the section.

(Ord. of 11-4-97, § 11.1; Amd. of 4-4-23(1))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bulloch-county/code/10.1@2026-02-03-5087e9a476

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.