--- title: Bulloch County Code of Ordinances, Section 10.2. Inspections collection: local-codes id: local-code:bulloch-county/code/10.2 cite_as: Bulloch County, Ga., Code of Ordinances ยง 10.2 canonical_url: https://georgiacommons.org/counties/bulloch/code/10.2 md_url: https://georgiacommons.org/counties/bulloch/code/10.2.md text_url: https://georgiacommons.org/counties/bulloch/code/10.2/text source_url: https://library.municode.com/ga/bulloch_county/codes/code_of_ordinances date: 2026-02-03 status: active jurisdiction: county:bulloch jurisdiction_name: Bulloch County county_fips: "13031" corpus_version: local-codes-bulloch-county-4e0d311e8c77 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/bulloch/code/~appendix-b/~article-x.md previous: https://georgiacommons.org/counties/bulloch/code/10.1.md next: https://georgiacommons.org/counties/bulloch/code/10.3.md index: https://georgiacommons.org/counties/bulloch.md branch: code edition: As published by Municode, current through 2026-02-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:bulloch-county/code/10.2@2026-02-03-003980717d --- # Bulloch County Code of Ordinances, Section 10.2. Inspections > As published by Municode, current through 2026-02-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS (APRIL 4, 2023) / Article X - CONSTRUCTION SCHEDULE 10.2.1. Inspections. Inspections shall follow the procedures and requirements defined in the phases contained in schedule 10.1. 10.2.2. Work stoppage. A stop-work order may be issued at any time if it is determined to be necessary due to failure of the subdivider to comply with any of the requirements of this appendix, the zoning ordinance, or the soil erosion and sedimentation control ordinance. A stop-work notice shall be posted on the site and the subdivider shall be notified in writing concerning the reasons for the stop-work order. Any work which proceeds in violation of a stop-work order shall subject the subdivider to penalties as prescribed in applicable regulations. 10.2.3. Work delays. If construction during any phase of development is delayed due to inclement weather or for other reasons, the subdivider shall notify the county prior to resuming construction activity. Schedule 10.2.1: Construction Inspections Procedures and Requirements Construction Phase Procedure Clearing/grubbing After issuance of land disturbance permit and providing the required notice to the county, clearing of the rights-of-way may begin. Street grading Following inspection and approval of the street clearing and grubbing, and street grade stakes have been set by the project's engineer, the contractor may proceed with the grading of the streets. Compaction tests shall be made as required by the development inspector to determine that the required maximum dry density is achieved. At least one test shall be made over each storm drain pipe after it has been covered with 18 inches of back fill material. Re-grading of ditches on existing county roads should be complete. Construction Phase Procedure Sub-grade compaction Following the completion and approval of the street sub-grade grading and installation of any curb and gutter or approved shoulder stabilization, the contractor may proceed with the preparation of the sub-grade. Proof-roll compaction tests shall be made on all areas of the finished sub-grade material with the county engineer or designee in attendance. Laboratory testing for moisture content and density shall be performed by a Georgia DOT approved testing consultant at the minimum rate of one test per 1,500 linear feet per two lanes. Additional testing may be required by county engineer or designee due to failing test results or site conditions. Utility improvements Following inspection and approval of the street grading and storm drainage by the development inspector, the contractor may proceed with utility improvements. The development inspector shall observe installation and review pipe material, manufacturer, class, and size for conformance with plans; observe pipe-laying operation to ensure that all joints are properly made, pipes are true to line and grade, compaction and back fill are done according to specifications; document the depth and type of bedding, trench conditions, compaction, the location of all service stub outs and connections, back filling and location of all utilities; and perform and document all final acceptance testing according to plans. Curb and gutter (where applicable) Following the installation of all proposed sanitary sewer and/or water lines and acceptance of the street grading the contractor may proceed with the construction of the curb and gutter. Base preparation Following the inspection and approval of the street sub-grade, the contractor may proceed with the construction of the street pavement base. Proof-roll compaction tests of all areas of the finished base shall be performed with the county engineer or designee in attendance. Laboratory acceptance testing of in-place density and thickness shall be made by a Georgia DOT-approved testing consultant at a minimum rate of one test per 1,500 linear feet per two lanes. Additional testing may be required by county engineer or designee due to failing test results or site conditions. Construction Phase Procedure Paving After the road base has been inspected and approved, the contractor may proceed with the construction of the asphaltic concrete binder and/or surface courses. The proposed asphalt job mix formula shall be submitted to the county engineer for approval at least two weeks prior to paving. The development inspector shall inspect and document the placement of asphalt pavement for compliance with material and weight specification and obtain from the contractor all records of asphalt mix and materials quantities. Laboratory testing of pavement thickness shall be done at a minimum rate of one test per 1,000 linear feet per two lanes. Additional testing may be required by county engineer or designee due to failing test results or site conditions. Soil erosion and sedimentation control During all of the stages of inspection, soil erosion and sedimentation control measures shall be inspected at any time determined necessary to ensure compliance with the approved plan. The subdivider is responsible for continued maintenance of all soil erosion and sedimentation control measures as required by the county ordinance. ## History (Amd. of 4-4-23(1))