The process of providing and managing access to land development while preserving the flow of traffic in terms of safety, capacity, speed, and congestion prevention. 3.2.5. Applicant. The legal or beneficial owners of land included in a proposed development, including the holder of an option or contract to purchase, or person having an enforceable proprietary interest in such land. See also developer and subdivider. 3.2.6. Approving authority. Refers to either the building and zoning official, the county planning and zoning commission, or the board of commissioners when they have authority to approve plats and plans according to schedule 4.6.2, in article IV of these regulations. 3.2.7. As-built plans. "As-built" plans are site plans depicting improvements made in any subdivision or planned development that were previously not accepted by the approving authority, or site plans that varied substantially from the preliminary or final plats previously submitted for review and approval. Their purpose is to provide a permanent record of the location, size and design of infrastructure improvements that will aid county departments in future maintenance efforts. 3.2.8. Buffer. A strip of land reserved for vegetation, landscaping, or other structures to separate developed areas from other properties or uses. 3.2.9. Buildable area. That portion of any lot which may be used or built upon in accordance with the regulations governing the given zoning district within which the particular lot is located, once the various front, side and rear yard setbacks required for the district have been subtracted from the total area. 3.2.10. Building. Any structure having a roof and intended for shelter, housing or enclosure of persons, animals, or property of any kind. 3.2.11. Building line. A line extended along the foundation of a building from which is measured the distance that a building must be set back to meet the minimum distance from the building line to the front, rear or side property line or in some cases, to the center line of an adjacent roadway. 3.2.12. Building site. The ground area of a building or buildings together with all open spaces surrounded by said building or buildings. 3.2.13. Building and zoning official. One or more persons, officers or officials or his authorized representative, whom the county manager has appointed to administer and enforce, individually or collectively, the building code, subdivision, and zoning ordinances. 3.2.14. Certified document. A survey, sketch, plat, map or other exhibit is said to be certified when a written statement regarding its accuracy or conformity to specified standards is signed by the specified professional engineers, registered surveyor, architect, or other legally recognized person. 3.2.15. Community water system. A system that provides piped water to the public for human consumption, if such system has at least 15 service connections or regularly serves an average of 25 individuals at least 60 days out of the year. Such terms include: (1) Any collection, treatment, storage, and distribution facilities under the control of the operator of such system and used primarily in connection with such system; and (2) Any collection or pre-treatment storage facilities not under such control which are used primarily in connection with such system. 3.2.16. Density. The number of units or buildings per acre, or the number of people per unit, building, acre or mile, or the quantity of people, structures or units within a specified area. 3.2.17. Density, net. The total number of dwelling units per acre of land, excluding dedicated streets, sidewalks, sensitive natural resources, parks and open space. 3.2.18. Developer. Any individual, subdivider, firm, association, partnership, corporation or any other legal entity commencing proceedings under these regulations. See also applicant and subdivider. 3.2.19. Easement. The right or privilege of using another's property, for purposes such as constructing and maintaining sanitary sewers, water mains, electric lines, telephone lines, storm sewers, gas lines, bicycle paths, pedestrian ways, ingress and egress. 3.2.20. Engineer. Any person being licensed by the state of Georgia as an engineer capable of determining the correct manner in which to construct roads, streets, highways, water and sewage systems, drainage system, structures or other technical related areas. 3.2.21. Engineer, county. The county engineer appointed by the County Manager of Bulloch County. 3.2.22. Family. Two or more persons occupying a single dwelling unit where all members are related by blood, marriage, adoption, or in foster care. Refer to zoning ordinance for standards. 3.2.23. Flood prone areas. The land that is usually flooded whenever a rise in the water level of a creek, stream, river or other body of water is experienced. That land adjacent to a creek, stream, river channel, canal or other body of water that is designated as a floodplain or flood prone area by a governmental agency.