Skip to content
Georgia Commons
Menu

Bulloch County · Code of Ordinances

Appendix B - SUBDIVISION REGULATIONS (APRIL 4, 2023) / Article III - RULES AND DEFINITIONS

3.2.61. Reserved.

Reserved

About this text

  • As published by Municode, current through 2026-02-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

3.2.62. Surveyor. A person who is licensed by the State of Georgia as a registered land surveyor.

3.2.63. Structure. Anything constructed or erected that requires a fixed location on the ground or which is attached to something having a fixed location on the ground.

3.2.64. Subdivider. Any person, firm or corporation who or which divides for sale, rent or lease or develops any land deemed to be a subdivision as herein defined.

3.2.65. Subdivision. The division of a lot of record into two or more lots, building sites, or other divisions for the purposes of sale, devise, or development, whether immediately or in the future, except that a subdivision does not include any of the following:

(a) The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are at least equal to the standards of the zoning ordinance;

(b) The division of land where no new street or streets is involved and where no new public or community water system or sanitary sewer system requiring permits by the Georgia Environmental Protection Division is involved; provided, however, that the division of land that was previously approved as a subdivision with a new street or streets or with a new public or community water system or sanitary sewer system shall not come within this exception.

Plats of such exceptions shall be required to be submitted as information to the building and zoning official which shall indicate such fact on the plats.

3.2.66 Traffic impact study. A study conducted by a certified professional traffic operations engineer (PTOE) to analyze the development impact to the transportation network.

Studies typically examine the trip generations from a site and determine improvements required; methodology to be used shall be approved by the county engineer. Studies for proposed developments shall be required that meet the thresholds described in the current edition of the Multimodal Transportation Impact Analysis for Site Development Recommended Practice, prepared by the Institute of Transportation Engineers, and shall generally follow its methodology outlined, with adjustments as agreed upon by the county engineer.

The GDOT Driveway and Encroachment Manual and Manual on Uniform Traffic Control Devices (MUTCD) are typically used for evaluation as well. For the purpose of this appendix a traffic impact study is required to have content according to section 4.10 of the zoning appendix and submitted according to schedule 5.6.3 of this appendix.

3.2.67. Use. Any purpose for which a building or tract of land may be designed, arranged, maintained, or occupied; or any activity, occupation, business, or operation carried on in a building or structure or on a tract of land.

3.2.68. Waterfront. Any site shall be considered as waterfront property provided any or all of its lot lines abut on or are contiguous to any body of water including creek, canal, river or any other body of water, natural or artificial, including marshland, not including a swimming pool, whether said lot line is front, rear or side.

3.2.69. Yard. A required open space on a lot that is left unoccupied with structures and facilities, except as permitted in this ordinance. A yard may also be known as a setback.

3.2.70. Yard, front. The open space on a lot located between the right-of-way boundary of the abutting street and the front building line as extended to the lot lines to either side. Any yard lying between an abutting street and the building line is considered a front yard. For example, in the case of a corner lot which is abutted on two sides by streets, both yards abutting the streets would be front yards; setbacks and other development standards for front yards would apply to both of these yards.

3.2.71. Yard, rear. The open space located between the rear property line and the rear building line as extended to the side lot lines.

3.2.72. Yard, side. The open space located between the side property line and the side building line extended to the front and rear lot lines.

3.2.73. Zoning ordinance. An officially adopted ordinance (if applicable) that regulates the manner, type, size and use to which a piece of property may be put.

History

The history line the source prints at the end of the section.

(Ord. of 11-4-97, § 3.2; Amd. of 4-4-23(1); Amd. of 12-17-24)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bulloch-county/code/3.2.61@2026-02-03-b6a0fac56a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.