--- title: Bulloch County Code of Ordinances, Sec. 4-52. Inspections collection: local-codes id: local-code:bulloch-county/code/4-52 cite_as: Bulloch County, Ga., Code of Ordinances ยง 4-52 canonical_url: https://georgiacommons.org/counties/bulloch/code/4-52 md_url: https://georgiacommons.org/counties/bulloch/code/4-52.md text_url: https://georgiacommons.org/counties/bulloch/code/4-52/text source_url: https://library.municode.com/ga/bulloch_county/codes/code_of_ordinances date: 2026-02-03 status: active jurisdiction: county:bulloch jurisdiction_name: Bulloch County county_fips: "13031" corpus_version: local-codes-bulloch-county-4e0d311e8c77 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/bulloch/code/~part-ii/~chapter-4/~article-ii/~division-2.md previous: https://georgiacommons.org/counties/bulloch/code/4-51.md next: https://georgiacommons.org/counties/bulloch/code/4-53.md index: https://georgiacommons.org/counties/bulloch.md branch: code edition: As published by Municode, current through 2026-02-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:bulloch-county/code/4-52@2026-02-03-3c22ff717e --- # Bulloch County Code of Ordinances, Sec. 4-52. Inspections > As published by Municode, current through 2026-02-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 4 - BUILDINGS AND BUILDING REGULATIONS / Article II - TECHNICAL CODES / Division 2 - BUILDING AND RELATED CODES ADMINISTRATION (a) The building official upon notification from the permit holder or his agent shall make the following inspections of buildings and such other inspections as may be necessary, and shall either approve the portion of construction as completed or shall notify the permit holder or his agent of any violation of compliance with this division: (1) Foundation inspection/temporary power: To be made after trenches for footings are excavated and all forms and required reinforcement materials erected. Temporary electric service should also be erected. (2) Slab house: open plumbing - roughed-in plumbing tests on waste lines and water lines and open cell foundation walls with reinforcement. (3) Sub-floor house: foundation walls, bond beam/open cell prior to placement of concrete. (4) Pre-slab: moisture barrier placement and thickness of slab. (5) Sub-floor: foundation walls, bond beam/cells filled with concrete and anchor bolt placement. (6) Sub-floor: open framing to verify spans, anchoring and termite protection. (7) Exterior sheathing: verify nailing patterns, sheathing placement and overlaps and purlins as required. (8) Dry-in inspection: To be made after the roof, all framing, fireblocking and bracing is in place. Plumbing, electrical and mechanical systems are to be roughed-in, including all pipes and concealed wiring. Chimney ducts and vents are complete. (9) Insulation inspection: Inspection shall be made to determine compliance with the energy efficiency chapter of the International Building Code and shall include, but not be limited to, inspections for: envelope insulation R and U values, fenestration U value, duct system R value, and HVAC and water-heating equipment efficiency. (10) Permanent power inspection: Inspection shall be made to determine compliance with the National Electric Code. Upon compliance with the National Electric Code, the building department will fax to the appropriate power company an approval to connect power to the building. (11) Certificate of occupancy inspection: a. Certificate of occupancy is required before a structure for which a building permit has been issued may be occupied or used. The certificate of occupancy must be signed by the zoning administrator and building official and attest that to the best of his / her knowledge all requirements of this chapter have been met. The owner/contractor will then receive the certificate of occupancy to be used as confirmation that he/she has complied with the provisions of this chapter. b. The building official will issue the certificate of occupancy once all applicable building codes and other uniform development standards and ordinances have been met. However, if the building official finds that all requirements of such ordinances have not yet been met when the owner/contractor seeks a certificate of occupancy, the building official will not issue the certificate of occupancy. The building official will notify the owner/contractor within ten days, stating reasons for the refusal. The owner/contractor will then need to confer with the building official to determine what he/she needs to do in order to comply with the ordinance and be eligible for a certificate of occupancy. (b) Work shall not be done on any part of a building or structure beyond the point indicated in each successive inspection without first obtaining the approval of the building official. Such approval shall be given only after inspection has been made of each successive step in the construction as indicated by each of the foregoing inspections. (c) To the extent possible, the building official shall schedule and make the required inspection within 48 hours, excluding Saturdays, Sundays and county-observed holidays. Upon receipt of notification of a required inspection, the building official will schedule the date and time for the inspection. ## History (Amd. of 4-5-05(1); Amd. of 1-19-10(1))