The schedules below shall be followed for the content of all sketch plans, plats, plan details, construction details, supplemental information, and required certifications. Schedule 5.6.1: Required Content of Plat and Plan Details Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat Planned Development Copies required Complete sets of plats, construction plans and required supplemental information. One electronic copy in a .pdf format shall be submitted unless the applicant can clearly demonstrate why it cannot be provided, with cost not being the prohibitive factor. Phasing Phasing or pod development shall be illustrated.(1) X X Re-subdivision In case of a plat to be resubdivided, a copy of the existing plat with proposed re-subdivision superimposed thereon. X X X Scale: Graphic and drawing Drawing scale of not less than 100 feet to one inch. The north point shall be identified as magnetic, true or grid north. X X X X Vicinity map Presented at a scale showing the relationship of the proposed subdivision to surrounding development. X X X X Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat Planned Development Name of development Proposed name of subdivision or development (should not duplicate other subdivisions or developments phonetically). X X X X Contact information: Applicant Name, address and telephone number. X X X X Contact information: Design professionals Name, address and telephone number of architects, surveyors, engineers and designers. X X X Contact information: Property owner(s) All names and addresses of all property owners of the site. X X X Contact information: Adjacent landowners All names and addresses of all owners of the land adjacent to the site and location of those property lines. X X X Metes and bounds description A written legal description of the acreage to be subdivided. X X Accuracy: Boundary identification and survey Proper identification of the boundaries of the tract to be subdivided with all bearings and distances indicated. The boundary survey shall be so accurate that the error of closure is 1:[10,000] or more. X X X Accuracy: Lines Sufficient data to determine readily and reproduce accurately on the ground the location, bearing, length and width of every street and alley line, lot line, easement, boundary line and building line, whether curved or straight.(2) X X Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat Planned Development Date of preparation Date of preparation. X X X X Adjoining property lines Adjoining property lines on the property to be subdivided. X X Lot details Total acreage affected, layout of all lots, including building setback lines; scaled dimensions on lots and lot sizes; and map and parcel number. X X X X Buildings Located on the property to be subdivided. X X X X Drainage basin The acreage of each drainage basin affecting the proposed subdivision.(3) X X Elevation data All elevations shall refer to NAVD 1988 or future adopted datum where public water and/or public sewers are to be installed. X X X Jurisdictional boundaries City and county lines (where applicable). X X X X Land use Existing and proposed. X X X Public or common use Land reserved or dedicated for public or common use including streets and rights-of-way (existing and proposed). X X X X Zoning District classification of adjoining land and land to be subdivided. X X X X Railroads Location and width (existing or abandoned). X X X X Setbacks for communication towers Setback from tower(s) on the property or on adjacent properties. X X X X Streets and roads Location and width (existing and abandoned). X X X X Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat Planned Development Utilities Location of lines, poles, pedestals, manholes, and towers with width and use of easements and right-ofway. X X X Utility detail: Existing Size and location of existing sewers (including grades and invert elevations), water mains, drains, culverts or other underground facilities within the street or within the right-of-way of streets or roads adjoining the tract. X X Natural features Natural features such as streams, lakes, swamps, and land subject to flood based on a 100-year flood frequency on the property to be subdivided. X X X X Wetlands For sketch plan, as shown by the soils maps of Bulloch County. For preliminary and final plats, final wetland delineation as verified by the U.S. Army Corps of Engineers. X X X X Topography Existing and proposed topography by contours at vertical intervals of not more than one foot. X X (1) Each phase or (in the case of mixed uses, or sections of the development with similar uses but different development intensities) pod of development should be annotated by the order or sequence in which development will occur. (2) This shall include the radius, point of tangency and other data for curved property lines and curved streets, to an appropriate accuracy and in conformance with good surveying practice. (3) The drainage basin may extend beyond the area to be subdivided. Schedule 5.6.2: Required Content of Construction Improvement Details Information Requirements and Specifications Preliminary Plat Final Plat Planned Development Streets and commercial driveways Layout of streets and roads with lengths and widths, road names and designations, centerline profiles of natural and finished grades (with percent of slope) and cross sections. X X Pedestrian ways Layout and location of pedestrian ways and crosswalks with widths, profiles of natural and finished grades (with percent of slope) grades and cross sections. X X Sanitary sewer Layout of sanitary sewers (if applicable) with grade, pipe size and material, location of manholes, and points of discharge. X X Storm sewer Topography and layout of storm sewer system including details with accurate location and length and width of slope, top and invert elevations, materials and sizing of all storm drainpipes, detention structures and outlets. Calculations showing volumes and outflow rates. X X Water supply Engineering report including final plans and specifications for supply and distribution prepared and approved by an engineer licensed in the state of Georgia, demonstrating compliance with Georgia EPD standards and the requirements of this appendix. X X Topographical changes Existing and proposed contour elevations at no greater than one-foot intervals. X X Information Requirements and Specifications Preliminary Plat Final Plat Planned Development Proposed finished floor elevation Proposed finished floor elevation for structures on each lot. X X X Construction schedule A timing schedule indicating the anticipated development sequence's starting and completion dates and the time of exposure of each area before the completion of effective erosion and sediment control measures. X X As-built plans As-built plans shall be required for any water and sanitary sewer systems, topographical changes affecting drainage and storm sewers systems, streets, pedestrian ways and any other structures located upon any property dedicated to the county for future maintenance. A GIS file (.dxf or .dwg CAD format with file projection s/b State Plane NAD 83 Georgia East 1001 Feet) mapping all infrastructure improvements shall be required. X X Schedule 5.6.3: Required Supplemental Information Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat (FP) or AsBuilt (AB) Planned Development Tax obligations Proof of payment of all ad valorem taxes currently owed on the subject property. X X Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat (FP) or AsBuilt (AB) Planned Development Road encroachment permit Approval from county engineer before installation of any improvements or construction within any county right-of-way. X X Road naming and addressing Plan for road naming and addressing approved by E-911 Director and Geographic Information Services. X Deed Recorded deed vesting title in the owner(s) and a copy of any recorded plat showing the property, and approved easements. X X Architecture Renderings and elevations of exterior structures. X X Covenants Proposed restrictive covenants.(1) X X Traffic Impact study and/or access evaluation.(2) X X Environmental Impact study or site assessment.(3) X X Market Impact study for market feasibility.(3) X Landscaping Plan prepared with sufficient detail to determine the required amount and type of suitable materials that address buffers, screening and associated signage. Location of utilities shall be shown on landscaping plans. X X X Information Requirements and Specifications Sketch Plan Preliminary Plat Final Plat (FP) or AsBuilt (AB) Planned Development Sanitary sewer disposal Soils study provided to the health department (for developments not using a sanitary sewer system). X X Soil erosion Plan that meets requirements in the county soil erosion and sedimentation ordinance. X X Stormwater management and drainage plan Plan that meets requirements in the county's stormwater and drainage ordinance. X X Development inspections documentation Verification that all required inspections have been made and approved in conformance with section 10.2. FP X Performance guarantees In conformance with section 6.4 of these regulations and the county soil erosion and sedimentation ordinance. X X Fire safety and protection Plan that shows hydrant placement, fire department connections and fire access lanes acceptable to the county Fire Chief. X X X Fire flow and hydrant test Plan that shows evidence of fire flow and hydrant test results for community water system. X (1) Required if common open space is proffered or special zoning conditions are applicable. (2) Required for rezoning application or when trip generation is determined to be 500 daily trips or more, or when an access evaluation is required by the County Engineer or the Georgia Department of Transportation. (3) May be required if zoning conditions are applicable, if a development of regional impact, or where a use where the administrative officer requires adequate review. Schedule 5.6.4: Required Content for Certifications Affixed to Final Plats and Planned Developments Certificate for approval of recording "The subdivision plat known as _______________, has been found to comply with the Bulloch County Subdivision Regulations and was approved by the building and zoning official on the _____ day of __________, 20___, for recording in the office of Clerk of Court of Bulloch County, Georgia. Bulloch County Building and Zoning. Include signature lines with printed name and title and date for building & zoning official, county engineer, county manager or designee, and state agencies where required. Certificate of accuracy "I hereby certify that this Plat is a true, correct and accurate survey as required by the Bulloch County Subdivision Regulations; and was prepared from an actual survey of the property made under my supervision, and that monuments shown have been located and placed to the specifications set forth in said regulations". Include signature lines with printed name and title and date for registered land surveyor (and license number). Certification of ownership and dedication "It is hereby certified that I am (we are) the owner(s) of the property shown and described hereon and that I (we) hereby dedicate all streets, alleys, walks, parks and other sites to public or private use as noted. It is further certified that the streets, drainage system, sewer system and water system in _______________ Subdivision as shown on the plat dated __________ prepared by _______________ have (has) been installed in accordance with the Preliminary Plat (Construction Drawings) approved (Date) __________. It is understood this is not an assumption of maintenance by the governing authority. This dedication is for the public's right of ingress and egress only". Include signature lines with printed name and title and date for owner and witness. Engineer's certificate for stormwater runoff I, _______________, a registered Professional Engineer in the State of Georgia, hereby certify that the grading and drainage plans for the project known as _______________ lying proposed for Bulloch County, Georgia, have been reviewed under my supervision, and state that the execution of said plans will comply with the Bulloch County Stormwater Ordinance. This the _____ day of __________, 20___. Georgia Registration No. __________. Include signature lines with printed name and title and date for engineer. As-built stormwater facilities I, _______________, a registered Professional Engineer in the State of Georgia, hereby certify that the stormwater facility (facilities) for the project known as _______________ lying proposed for Bulloch County, Georgia, has been constructed to approved plans and specifications and in accordance with requirements of the Bulloch County Stormwater Ordinance. This the _____ day of __________, 20___. Georgia Registration No. __________. Include signature lines with printed name and title and date for engineer. Certificate of buffer and screening "I hereby certify that the buffers indicated on this plat are reserved for the planting of trees and shrubs by the owner. The placement of structures other than approved fencing hereon is prohibited." Include signature lines with printed name and title and date for owner and witness. Certificate of disclosure for private streets "I hereby disclose that the ownership of the streets in this development shall be vested to the owner and subsequent purchasers who shall have responsibility for maintenance, liability, and rules regarding their use. It is understood that there shall be no assumption of maintenance by the governing authority, and that all streets, drainage and other infrastructure has been installed according to the specifications set in the county regulations. Each lot owner shall have title to the centerline of the private street adjacent to his lot subject to the 60-foot easement described herein." Include signature lines with printed name and title and date for owner and witness.