Skip to content
Georgia Commons
Menu

Bulloch County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 6.5 - ENVIRONMENTAL PROTECTION / Article V - STORMWATER CONTROL / Division 1 - GENERALLY

Sec. 6.5-68. Compliance with article.

About this text

  • As published by Municode, current through 2026-02-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All development, excavation, construction, or land-disturbing activity conducted within the unincorporated area of Bulloch County, except for the activities listed in section 6.5-69, must:

(a) Be conducted in accordance and compliance with the standards laid out in this article.

(b) Be preceded by filing of an application and a stormwater management and drainage plan (SDP) and issuance of a permit to conduct such activity.

(c) Be maintained by the owner in compliance with the principles and standards set out in division 2 of this article.

History

The history line the source prints at the end of the section.

(Amd. of 4-4-23(3))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bulloch-county/code/6.5-68@2026-02-03-a4501fa9e5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.