Sec. 6.5-70. Permit; filing and contents of stormwater management and drainage plans (SDP).
About this text
- As published by Municode, current through 2026-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Persons proposing development, construction or land-disturbing activity shall file an application and SDP with the planning and development department which conforms to the standards set out in this article.
(b) No development, construction or land-disturbing activity may be commenced until a permit is issued upon determination that the SDP complies with the principles and standards for grading and drainage as contained in this article.
(c) A permit will be issued as soon as practical following filing of the application and SDP.
If the permit is denied, the reason for the denial shall be specified in writing to the applicant.
(d) No applications shall be accepted unless accompanied by the SDP submitted in a format acceptable to the county engineer and meeting the requirements in this section and conforming to the principles and standards described in division 2 of this article.
(e) An application shall be accompanied by appropriate fees approved by the board of commissioners.
(f) If a project is developed in phases, a separate permit is not required for each phase provided that an overall SDP is submitted and approved for all phases for the development, and the overall permit has not lapsed in accordance with subsection 6.5-70(i)(8).
(g) The permit may be suspended, revoked or modified by the county engineer upon finding that the holder is not proceeding in compliance with this article or the contents of the plan filed with the county engineer.
(h) The SDP, including all grading and drainage control plans contained therein, shall be prepared under the supervision of a registered professional engineer in the State of Georgia.
Also see subsection 6.5-70(i)(6).
(i) The SDP shall contain the following data:
(1) The plan shall contain a site location map of the project area indicating the location of the project in relation to the rivers and streams in the area, roadways and jurisdictional areas.
(2) The plan shall contain a topographic map showing existing and proposed contours, proposed drainageways, as well as existing and proposed waterways and the proposed features of the developed drainage structures, and temporary and permanent vegetative and structural erosion and sediment control measures.
(3) The plan shall contain a boundary line survey, prepared by a state registered surveyor, of the site on which the work is to be performed. The plan shall be shown at normal scale.
(4) The plan shall contain a narrative including the following:
a. A description of the maintenance program for drainage structures as necessary to keep them free of debris build up and functioning with clear unobstructed openings and piping systems as designed.
b. A description of general topographic and soil conditions.
c. A description of the zoning classification of adjacent property and a description of existing structures, buildings and other improvements located on adjacent properties.
(5) The site plan and supporting documentation should further include:
a. Evidence of compliance with the requirements of this article for grading, vegetation, alteration, erosion control, and drainage system alteration or development.
1. Grading plans shall illustrate existing and proposed contours to one-foot intervals.
2. Related plans shall show locations of structures, roads, surface drainage, utilities, existing and proposed drainage conduits and proposed alterations to the existing site.
b. A hydrologic engineering analysis of stormwater runoff under existing and proposed developed site conditions and a detailed evaluation of the projected effects on upstream and downstream properties within the affected drainage basins.
1. This analysis shall include a determination of the culvert, floodplain and channel cross section area required to carry the affected stream at the 25- and 100-year flood stage level.
2. A summary table shall be included for the drainage system showing a comparison between the pre-development runoff rate and the postdevelopment runoff rate for the 2-, 5-, 10-, 25-, 50- and 100-year rainfall events.
3. The requirements of the complete hydrologic study may be waived by the county engineer where the site plan illustrates existing and proposed improvements sufficient to ensure compliance with applicable provisions of this article.
c. Delineation of the boundaries and contour elevations of the 100-year floodplain as represented by the county's flood hazard maps prepared by the Federal Emergency Management Agency.
1. The actual building site in relation to the 100-year floodplain boundaries shall be shown. For any structure allowed to be located in the 100-year floodplain, as regulated in the county's flood damage prevention ordinance, the proposed finished floor elevation of the first floor shall be shown. Upon final construction of the finished floor, the owner or his engineer or land surveyor on the owner's behalf, shall submit an elevation certification stating the installed finished floor elevation(s) of any building structures.
d. The elevation contours representing the intermediate regional flood conditions shall be shown when they are located outside established ditch banks. A benchmark suitable for determining 100-year flood elevations shall be established.
(6) Upon development project completion, the location, size and invert elevations of pipe segments of the storm drainage system and of control weirs, and the maximum water surface elevations in retention ponds, shall be shown on the record drawings for a subdivision, and on record drawings for other developments which shall be submitted to the county engineer. The professional engineer reviewing the construction shall provide a certification that the development is in substantial compliance with approved plans for the project. When the hydraulic or hydrologic engineering analysis includes applications of the principles of flood routing, super critical flow, high energy dissipation or conversion, backwater curves, floodplain studies or other advanced hydraulic or hydrologic engineering techniques, the analysis shall be made by a current professional engineer licensed in the state and proficient in hydraulics and hydrology.
(7) The professional engineer responsible for the drainage analysis shall certify compliance with this article as shown under section 6.5-113 of this article.
(8) In the event the activity for which a permit is granted is not initiated within 12 months of the granting of the permit, then the permit shall lapse.