(a) Design principles. Development, excavation, construction or land-disturbing activity shall be conducted in a manner consistent with the following principles: (1) Maintaining, where feasible, the natural environment of county streams or drainageways through reduction of flow quantities resulting from new development and, where feasible, restoring the floodplain to its natural functional purpose to resolve existing flooding problems, but recognizing the necessity of using urban streams for stormwater runoff in those situations where maintenance of the natural stream environment would result in continuation or worsening of flooding conditions. (2) Encouraging innovative design solutions to the effective detention/retention and reduction of runoff. Drainage control measures to retain, reduce and regulate the rate of stormwater discharge shall include, but need not be limited to, retention or detention ponds, percolation facilities, open space areas, and oversized storm drains with restricted outlets. In addition, the county encourages the development of retention facilities in such a manner that they will become aesthetically and recreationally beneficial to the community in which they are located. (b) Design and maintenance standards. All development, construction and landdisturbing activities shall be conducted in compliance with the following standards: (1) All engineering design items for storm drainage and delineation of the 100-year floodplain shall meet the applicable minimum requirements available from the county engineer. Rainfall intensities used in hydrologic computations shall not be less than shown by applicable rainfall curves published by the National Weather Service for the affected area. (2) A combination of storage and controlled release of stormwater runoff shall be required for all developments and construction which will increase the peak rate of runoff from the site by more than one cubic foot per second (cfs) for a ten-year frequency storm of 24-hour duration; however, this shall not apply to those activities specifically exempted in section 6.5-69. (3) The release rate of stormwater from all developments where retention or detention is required shall not exceed the peak stormwater runoff rate from the area in its existing state from all intensities up to and including the 25-year frequency for a 24-hour storm. In the event that the county engineer determines that the existing downstream channel or storm sewer system is inadequate to accommodate the release rate provided above, then the allowable release rate shall be reduced to that rate permitted by the capacity of the downstream channel or storm sewer system. (4) Where it can be demonstrated by the developer that a higher stormwater release rate will not be contrary to the purpose and intent of this article and where such proposed release rate will not adversely affect properties in the downstream portion of the watershed, the county engineer may permit such release to be used as deemed appropriate. Streets, blocks, lots, parks and other public grounds shall be located and laid out in such a manner as to minimize the velocity of overland flow and allow maximum opportunity for infiltration of stormwater into the ground, and to preserve and utilize existing and planned streams, channels, and detention basins, and include, whenever possible, streams and floodplain within parks and other public grounds. (5) The drainage system being developed shall have adequate capacity to accommodate the flow from all upstream areas for a storm of 25-year design frequency, except for areas considered to be major drainage canals. The major drainage canals shall have adequate capacity to accommodate the flow from all upstream areas for a storm of 100-year frequency. (6) Land uses within the 100-year floodplain shall not diminish or restrict the capacity of the channels or floodplains of the stream or its tributaries, drainage ditches or any other drainage facilities or systems, and shall not increase the 100-year elevation or velocity or concentration of flow in downstream areas. If the required hydrologic studies reveal that a request for filling or grading within the 100-year floodplain would overload the capacity of the channel downstream or increase flood stages upstream, the development permit shall be denied unless equivalent flow and storage capacity is replaced and maintained by the owner within the 100-year floodplain. Altered sections of the 100-year floodplain shall have a positive slope so as to provide positive drainage back to the stream flow line, and these sections must be maintained by the owners in perpetuity so as to prevent or remove silt buildup. (7) The live detention/retention storage to be provided shall be calculated on the basis of the 25-year frequency rainfall as specified by the National Weather Service for the affected areas. The detention/retention system required shall be that necessary to handle the runoff for all storm frequencies up to and including 25-year, 24-hour storm. Detention/retention control structures and other drainage improvements shall be located and designed to prevent erosion damage to adjacent property owners. Retention or detention control structures shall be sized for the release rate as presented in this section and will have provisions for overflow of the 50-year and 100-year storms without damage to the structure. (8) When the developer requests and the county engineer determines that development and construction projects are too small, or that engineering and economic factors make combined detention/retention or other drainage facilities more practical, the county may authorize the joint construction of these facilities to serve two or more properties by two or more developers. This authorization shall be granted by the county engineer. Where joint detention/retention facilities serving two or more properties are approved for construction, no use of land or occupancy of buildings within the properties served by these facilities shall be permitted until completion of the detention/retention facility, except upon approval of the county engineer. (9) When adequacy of existing drainage structures is being considered in association with proposed development, the overall capacity of the structure will be evaluated and divided among upstream properties. The available capacity will be divided among property owners based on acreage in the basin. Under no condition will the available capacity of the structure be exceeded. Should the developer desire to replace the structure in lieu of retention or detention, all downstream structures should be evaluated and deemed adequate. (10) The following requirements shall apply to the installation, development and maintenance of all retention, detention and sedimentation control facilities designed for storage of stormwater runoff: a. These facilities shall be located on tracts of land designated for this use on the recorded plat, with sufficient area around the perimeter to provide access for maintenance purposes. The access easement shall provide at least 20 feet of width outside of above-ground obstructions, including trees, headwalls, wires and settling basins or other drainage structures. b. Detention facilities shall release stormwater at a non-erosive velocity. The protected channel receiving the detention discharge shall incorporate features to reduce velocity to non-erosive levels at the point where such discharge enters the unprotected channel. If release is into a subsurface conduit the energy gradient in the receiving facility shall not be increased beyond the slope of the conduit. c. Spillway. Overflow for each stormwater storage area shall be provided in the event a storm in excess of the design capacity occurs. Such overflow shall be constructed to function without specific attention and shall become part of the excess stormwater passage. Emergency spillways shall be provided to permit the safe passage of runoff generated from a 100-year, 24-hour storm, or greater if required by state law. Where rooftop storage for excess stormwater is provided, the building shall be provided with adequate structural design to insure that roof failure does not occur. Overflow areas shall be provided so that the weight of stored stormwater will not exceed the structural capacity of the roof. d. Freeboard. Detention facilities shall have adequate capacity to contain the storage volume of tributary stormwater runoff with at least one foot of freeboard above the water surface of flow in the emergency spillway in a 100-year, 24-hour storm or as required by state law. e. Except as otherwise provided in this section, the property owner shall be responsible for the maintenance of these detention/retention facilities during grading and construction and following final approval of the completed project. This maintenance obligation shall be binding on future owners, successors and assigns of the property. (11) Curb inlets. All inlets shall be of standard design. Curb inlets should be located at the end of corner curve radius. (12) All buildings located adjacent to or in the 100-year floodplain shall be constructed in accordance with chapter 7 pertaining to flood damage prevention. (13) Special drainage system maintenance requirements are as follows: a. No impoundment of water which retains in excess of 0.5 acre-feet of runoff shall be removed without first obtaining a development permit, which shall only be issued after competent engineering studies provided by the developer show that this removal will not adversely affect downstream properties. b. Trash, garbage, construction materials, construction byproducts or other debris shall not be deposited in any part of the drainage system. c. No restrictions or barriers, including fences, may be placed in the drainage system without first obtaining a development permit. When onsite or offsite debris has accumulated within a floodplain in such a manner as to interfere with the free flow of water so as to increase the risk of hazardous inundation of upstream properties adjacent to the floodplain, the county engineer or public works director shall require the owner of the property where this debris was generated, if its source can be identified, to clear and remove the debris so as to permit the free flow of water. (14) Grading of individual lots. The developer is responsible for designing and grading individual lots in subdivisions so as to drain stormwater away from proposed or existing structures, and to eliminate any unintentional ponding of stormwater on the lot. Any required drainage easements shall be designed along lot lines unless approved by the county engineer. (15) Lot lines. Whenever the plans call for the passage and/or storage of stormwater runoff along lot lines, the grading of all such lots shall be prescribed and established for the passage and/or storage of waters, and no structure or vegetation which would obstruct the flow of stormwater shall be allowed, nor shall any change be made to the prescribed grades and contours of the specified stormwater channels. (16) Manholes. All utility sewer manholes constructed in an area designed for storage or passage of stormwater, shall be provided with either watertight manhole cover or be constructed with a rim elevation a minimum of one foot above the high-water elevation of design storm. (17) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. (18) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharges from the systems into drainageways. (19) Onsite waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (20) All subdivision proposals shall have public utilities and facilities such as telecommunications, sewer, gas, electrical and water systems located and constructed to minimize flood damage. (21) Easements and maintenance. Permanent easements for the detention and conveyance of stormwater, including easements of access to structures and facilities, along with required maintenance for detention basins and associated structures shall be permanently provided by the developer with responsibility becoming that of the private land owner or appropriate neighborhood association subject to inspection by the county engineer. Every detention basin or structure shall be legally defined on both deed and plat and the maintenance entity shall be specified. Maintenance agreements shall be implemented as specified in section 6.5-92.