--- title: Bulloch County Code of Ordinances, Section 7.3. Easements and utilities collection: local-codes id: local-code:bulloch-county/code/7.3 cite_as: Bulloch County, Ga., Code of Ordinances ยง 7.3 canonical_url: https://georgiacommons.org/counties/bulloch/code/7.3 md_url: https://georgiacommons.org/counties/bulloch/code/7.3.md text_url: https://georgiacommons.org/counties/bulloch/code/7.3/text source_url: https://library.municode.com/ga/bulloch_county/codes/code_of_ordinances date: 2026-02-03 status: active jurisdiction: county:bulloch jurisdiction_name: Bulloch County county_fips: "13031" corpus_version: local-codes-bulloch-county-4e0d311e8c77 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/bulloch/code/~appendix-b/~article-vii.md previous: https://georgiacommons.org/counties/bulloch/code/7.2.13.md next: https://georgiacommons.org/counties/bulloch/code/7.4.md index: https://georgiacommons.org/counties/bulloch.md branch: code edition: As published by Municode, current through 2026-02-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:bulloch-county/code/7.3@2026-02-03-1c81a2f23d --- # Bulloch County Code of Ordinances, Section 7.3. Easements and utilities > As published by Municode, current through 2026-02-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS (APRIL 4, 2023) / Article VII - DESIGN STANDARDS 7.3.1. Utilities. Easements shall have a minimum width of 15 feet and be located along the side or rear lot lines and shall be provided as required for utility lines and underground mains and cables. Recommendations on the proposed layout of cable, telephone and electric company easements should be sought from all of the utility companies serving the area. It shall be the responsibility of the applicant to submit copies of the preliminary plat to all appropriate public utility companies. Whenever practicable, the utilities shall be placed underground, according to the standards of the appropriate utility company. Community water systems shall follow the basic design standards in schedule 7.7.10 of this article. 7.3.2. Storm drainage. Easements for storm drainage shall conform substantially with the lines of any natural water course, channels, streams or creeks which traverse the subdivision or for any new channel which is established to substitute for an existing natural watercourse, channel, stream or creek. Such easements shall be of sufficient width to provide an adequate area for maintenance but shall not be less than 15 feet. All stormwater infrastructure and easements outside the rights-of-way will be owned and maintained privately by the owner/developer, private property owners or a common interest element. ## History (Amd. of 4-4-23(1))